Template:Infobox future infrastructure project
Appearance
Location | {{{location}}} |
---|---|
Proposer | {{{proposer}}} |
Project website | {{{official website}}} |
Status | {{{status}}} |
Type | {{{type}}} |
Cost estimate | {{{estimated cost}}} |
Cost estimate (high) | {{{max cost}}} |
Cost estimate (low) | {{{min cost}}} |
Start date | {{{planned start}}} |
Completion date | {{{planned finish}}} |
Stakeholders | {{{stakeholders}}} |
Supporters | {{{supporters}}} |
Opponents | {{{opponents}}} |
OpenStreetMap | {{{osm_id}}} |
Geometry | {{{geometry}}} |
Map | {{{map}}} |
This template uses Lua: |
Location | Norwich |
---|---|
Proposer | Norfolk County Council |
Cost estimate | £117 (2009) |
Stakeholders | Campaign for better transport, No to N25, Norfolk County Council |
Usage
[edit]The template text may be copied and pasted to the article as needed. There are no mandatory fields. All fields accept text strings.
{{Infobox future infrastructure project
|property_name =
|image_name =
|image_size =
|caption =
|image2_name =
|image2_size =
|caption2 =
|location =
|proposer =
|official website =
|status =
|type =
|estimated cost =
|max cost =
|min cost =
|planned start =
|planned finish =
|osm_id =
|supporters =
|stakeholders =
|opponents =
|geometry =
|footnotes =
}}
Notes
[edit]Applicability
[edit]This template can be used to provide structured details of an infrastructure project that is planned or under construction. This is distinct from the completed project which might have its own infobox. For example, a motorway may have been built and expanded in a number of separate projects – the motorway would have an infobox and the construction projects may also have separate infoboxes.
The footnotes section may be omitted if there are none.
Field usage
[edit]The usage of fields and the infobox is still being discussed however here are some proposed values for fields.
- status: aspiration/planned/approved/withdrawn/shelved/under_construction/completed
- type: road/rail/airport/building etc.