Jump to content

Loyang MRT station

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Sni56996 (talk | contribs) at 10:30, 25 January 2019 (G Spelling/grammar/punctuation correction). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Loyang
 CR3 


罗央
Rapid transit
General information
Owned byLand Transport Authority
Line(s)
PlatformsIsland
Construction
Structure typeUnderground
AccessibleYes
Other information
Station code CR3 
History
Opening2029; 5 years' time (2029)
Services
Preceding station   Mass Rapid Transit   Following station
Template:SMRT lines

Loyang MRT station (CR3)[1] is a future underground Mass Rapid Transit station on the Cross Island MRT line located in Pasir Ris, Singapore.[2][3][4]

History

Loyang was first mentioned in 2013 at the announcement of the Cross Island line as one of the residential areas that the future MRT line will serve.[5][6] Loyang station was officially announced on 25 January, 2019 as part of the first stretch of the Cross Island Line (CRL). Construction works for Stage 1 of the Cross Island line will begin in 2020 and the station will commence operations in 2029.[3]

References

  1. ^ "Land Transport Authority – We Keep Your World Moving". Facebook. Land Transport Authority. Retrieved January 25, 2019.
  2. ^ "Joint News Release by the Land Transport Authority (LTA) & SLA - Cross Island Line 1: New Links by 2029". Land Transport Authority. 25 January 2019.
  3. ^ a b Tan, Christopher (25 January 2019). "First phase of Cross Island MRT line finalised; will have 12 stations". The Straits Times. Retrieved January 25, 2019.
  4. ^ Yusof, Amir. "First phase of Cross Island Line to open by 2029 with 12 stations". Channel NewsAsia. Retrieved January 25, 2019.
  5. ^ Tan, Christopher (17 January 2013). "More new MRT lines to be built by 2030". The Straits Times. Retrieved January 25, 2019.
  6. ^ "Questions on the Cross Island Line". Government of Singapore. Retrieved January 25, 2019.

Template:Cross Island MRT Line navbox