Wolf Wind Farm
Appearance
This article, Wolf Wind Farm, has recently been created via the Articles for creation process. Please check to see if the reviewer has accidentally left this template after accepting the draft and take appropriate action as necessary.
Reviewer tools: Inform author |
Wolf Wind Farm | |
---|---|
Country | South Africa |
Location | Sarah Baartman District Municipality |
Coordinates | 33°09′S 25°33′E / 33.15°S 25.55°E |
Status | In Development |
Construction began | 2024 |
Owner | Red Rocket |
Operator | Red Rocket |
Wind farm | |
Type | Onshore |
Power generation | |
Units operational | 17 |
Make and model | Vestas: V162 & V163 |
Nameplate capacity | 85MW |
The Wolf Wind Farm Project is being developed by Red Rocket and is located 5km north of Wolwefontein in the Eastern Cape, South Africa. It's currently under construction and is expected to be completed by Q4 2024. Once operational, the wind farm will generating an estimated 360GWh annually. It's anticipated to mitigate a substantial 384,000 tons of CO2 emissions each year.[1]
The wind farm will utilize seventeen turbines manufactured by Vestas. These include five powerful V162-6.2MW machines and twelve V163-4.5MW machines, with a combined capacity of 85MW.
Red Rocket secured the project through the South African government's Renewable Energy Independent Power Producers Procurement Programme in Bid Window 5.[2]