Chandrayaan-3
This article documents a current or recent space mission. Details may change as the mission progresses. Initial news reports may be unreliable. The last updates to this article may not reflect the most current information. For more information please see WikiProject Spaceflight. |
Mission type | |
---|---|
Operator | ISRO |
COSPAR ID | 2023-098A |
SATCAT no. | 57320 |
Website | www |
Mission duration | 1 year, 5 months and 19 days (elapsed)
|
Spacecraft properties | |
Bus | Chandrayaan |
Manufacturer | ISRO |
Launch mass | 3900 kg[1] |
Payload mass | Propulsion Module: 2148 kg Lander Module (Vikram): 1726 kg Rover (Pragyan) 26 kg Total: 3900 kg |
Power | Propulsion Module: 758 W Lander Module: 738 W WS with Bias Rover: 50 W |
Start of mission | |
Launch date | 14 July 2023IST, (9:05:17 UTC)[2][3] | 14:35:17
Rocket | LVM3 M4 |
Launch site | Satish Dhawan Space Centre |
Contractor | ISRO |
Moon orbiter | |
Orbital insertion | 5 August 2023 |
Orbital parameters | |
Pericynthion altitude | 153 km (95 mi) |
Apocynthion altitude | 163 km (101 mi) |
Moon lander | |
Spacecraft component | Vikram lander |
Landing date | 23 August 2023IST, (12:32 UTC)[4] | 18:02
Landing site | 69°22′03″S 32°20′53″E / 69.367621°S 32.348126°E[5]
(between Manzinus C and Simpelius N craters)[6] |
Moon rover | |
Spacecraft component | Pragyan rover |
Landing date | TBD |
|
Chandrayaan-3 (transl. Moon-craft, ⓘ)[7] is the third Indian lunar exploration mission under the Indian Space Research Organisation's (ISRO) Chandrayaan programme.[7] It consists of a lander named Vikram and a rover named Pragyan, similar to those of the Chandrayaan-2 mission. The propulsion module carried the lander and rover configuration to lunar orbit in preparation for a powered descent by the lander.[8][9]
Chandrayaan-3 was launched on 14 July 2023.[10] The lander and rover landed near the lunar south pole region on 23 August 2023 at 18:02 IST, making India the first country to successfully land a spacecraft near the lunar south pole and the fourth country to soft-land on the Moon.[11][12][4] [13][14]
Background
On 22 July 2019, ISRO launched Chandrayaan-2 on board a Launch Vehicle Mark-3 (LVM3) launch vehicle consisting of an orbiter, a lander and a rover.[15] The lander was scheduled to touch down on the lunar surface in September 2019 to deploy the Pragyan rover. The lander ultimately crashed when it deviated from its intended trajectory while attempting to land.[16][17]
Following Chandrayaan-2, Chandrayaan-3 and further lunar missions were proposed.[18]
The European Space Tracking network (ESTRACK), operated by the European Space Agency (ESA), is supporting the mission. Under a new cross-support arrangement, ESA tracking support could be provided for upcoming ISRO missions such as those of India's first human spaceflight programme, Gaganyaan, and the Aditya-L1 solar research mission. In return, future ESA missions will receive similar support from ISRO's own tracking stations.[19]
Objectives
ISRO set the following mission objectives for the Chandrayaan-3 mission:
- Getting a lander to land safely and softly on the surface of the Moon.
- Observing and demonstrating the rover's driving capabilities on the Moon.
- Conducting and observing experiments on the materials available on the lunar surface to better understand the composition of the Moon.[20]
Spacecraft
Design
Chandrayaan-3 comprised three main components:
- Propulsion module
- The propulsion module carries the lander and rover configuration to a 100 kilometres (62 mi) lunar orbit. It is a box-like structure with a large solar panel mounted on one side and a cylindrical mounting structure for the lander (the Intermodular Adapter Cone) on top.[9][8]
- Lander
- The Vikram lander is responsible for the soft landing on the Moon. It is also box-shaped, with four landing legs and four landing thrusters capable of producing 800 newtons of thrust each. It carries the rover and various scientific instruments to perform on-site analysis.[21][22]
- The lander for Chandrayaan-3 has four variable-thrust engines with slew rate changing capabilities, unlike Chandrayaan-2's lander, which had five, with the fifth one being centrally mounted and capable only of fixed thrust. One of the main reasons for Chandrayaan-2 landing failure, attitude increase during the camera coasting phase, was removed by allowing the lander to control attitude and thrust during all phases of descent. Attitude correction rate is increased from Chandrayaan-2's 10°/s to 25°/s with Chandrayaan-3. Additionally, the Chandrayaan-3 lander will be equipped with a Laser Doppler Velocimeter (LDV) to allow measuring attitude in 3 directions.[23][24] The impact legs have been made stronger compared to Chandrayaan-2 and instrumentation redundancy has been improved. It will target a more precise 4 km (2.5 mi) by 4 km (2.5 mi) landing region based on images previously provided by the Orbiter High-Resolution Camera (OHRC) onboard Chandrayaan-2's orbiter. ISRO improved the structural rigidity, increased polling in instruments, increased data frequency and transmission, and added additional multiple contingency systems to improve lander survivability in the event of failures during descent and landing.[25][24]
- Rover
- The Pragyan rover is a six-wheeled vehicle with a mass of 26 kilograms (57 pounds). It is 917 millimetres (3.009 ft) x 750 millimetres (2.46 ft) x 397 millimetres (1.302 ft) in size.[26]
- The rover is expected to take multiple measurements to support research into the composition of the lunar surface, the presence of water ice in the lunar soil, the history of lunar impacts, and the evolution of the Moon's atmosphere.[27][28]
-
Integrated module
-
Propulsion module
-
Lander
-
Rover
Payloads
Lander
- Chandra's Surface Thermophysical Experiment (ChaSTE) will measure the thermal conductivity and temperature of the lunar surface.
- Instrument for Lunar Seismic Activity (ILSA) will measure the seismicity around the landing site.
- Langmuir Probe (LP) will estimate near-surface plasma density over time.[29]
Rover
- Alpha Particle X-Ray Spectrometer (APXS) will derive the chemical composition and infer mineralogical composition of the lunar surface.
- Laser-Induced Breakdown Spectroscope (LIBS) will determine the elemental composition (Mg, Al, Si, K, Ca, Ti, Fe) of lunar soil and rocks around the lunar landing site.[29]
Propulsion module
- Spectro-polarimetry of Habitable Planet Earth (SHAPE) will study spectral and polarimetric measurements of Earth from the lunar orbit in the near-infrared (NIR) wavelength range (1–1.7 μm [3.9×10−5–6.7×10−5 in]).[9][8]
-
Chandra's Surface Thermophysical Experiment (ChaSTE)
-
Instrument for Lunar Seismic Activity (ILSA)
-
Laser-Induced Breakdown Spectroscope (LIBS)
-
Langmuir Probe (RAMBHA-LP)
-
Spectro-polarimetry of Habitable Planet Earth (SHAPE)
Mission profile
Launch
Chandrayaan-3 was launched aboard an LVM3-M4 rocket on 14 July 2023, at 2:35 pm IST from Satish Dhawan Space Centre Second Launch Pad in Sriharikota, Andhra Pradesh, India, entering an Earth parking orbit with a perigee of 170 km (106 mi) and an apogee of 36,500 km (22,680 mi).
Orbit
After a series of manoeuvres that placed Chandrayaan-3 in a trans-lunar injection orbit,[30][31][32] ISRO performed a lunar-orbit insertion (LOI) on 5 August, successfully placing the Chandrayaan-3 spacecraft into orbit around the Moon. The LOI operation was carried out from the ISRO Telemetry, Tracking, and Command Network (ISTRAC) located in Bengaluru.[33][34]
On 17 August, the Vikram lander separated from the propulsion module to begin the last phase of the mission.[35]
Descent
On 23 August 2023, as the lander approached the low point of its orbit, its four engines fired as a braking manoeuvre at 30 kilometres (19 mi) above the Moon's surface. After 11.5 minutes, the lander was 7.2 km (4.5 miles) above the surface; it maintained its altitude for about 10 seconds, then stabilized itself using eight smaller thrusters and rotated from a horizontal to a vertical position while continuing its descent.
It then used two of its four engines to slow its descent to roughly 150 metres (490 ft); it hovered there for about 30 seconds before continuing downward and touching down at 12:32 UTC.[36][37]
Stage and sequence | Date/ Time (UTC) |
LAM burn time | Orbit | Orbital period | References |
---|---|---|---|---|---|
Earth orbit: Launch | 13 July 2023 | — | 170 km × 36,500 km (110 mi × 22,680 mi) | — | |
Earth bound maneuvers: 1 | 15 July 2023 | — | 173 km × 41,762 km (107 mi × 25,950 mi) | — | [38][39] |
Earth bound maneuvers: 2 | 17 July 2023 | — | 226 km × 41,603 km (140 mi × 25,851 mi) | — | [38][40] |
Earth bound maneuvers: 3 | 18 July 2023 | — | 228 km × 51,400 km (142 mi × 31,938 mi) | — | [41] |
Earth bound maneuvers: 4 | 20 July 2023 | — | 233 km × 71,351 km (145 mi × 44,335 mi) | — | [38][42] |
Earth bound maneuvers: 5 | 25 July 2023 | — | 236 km × 127,603 km (147 mi × 79,289 mi) | — | [43] |
Translunar injection | 31 July 2023 | — | 288 km × 369,328 km (179 mi × 229,490 mi) | — | [44] |
Lunar orbit injection | 5 August 2023 | 1,835 s (30.58 min) | 164 km × 18,074 km (102 mi × 11,231 mi) | Approx. 21 h (1,300 min) | [45] |
Lunar bound maneuvers: 2 | 6 August 2023 | — | 170 km × 4,313 km (106 mi × 2,680 mi) | — | [46] |
Lunar bound maneuvers:3 | 9 August 2023 | — | 174 km × 1,437 km (108 mi × 893 mi) | — | [47] |
Lunar bound maneuvers:4 | 14 August 2023 | — | 150 km × 177 km (93 mi × 110 mi) | — | [48] |
Lunar bound maneuvers:5 | 16 August 2023 | — | 153 km × 163 km (95 mi × 101 mi) | — | [49] |
Lander deorbit maneuvers: 1 | 18 August 2023 | — | 113 km × 157 km (70 mi × 98 mi) | — | [50] |
Lander deorbit maneuvers: 2 | 19 August 2023 | 60 s (1.0 min) | 25 km × 134 km (16 mi × 83 mi) | — | [51] |
Landing: 1 | 23 August 2023 | TBC | — | — | [4] |
Rover deployment: 1 | 23 August 2023 | — | — | — | [4] |
-
Moon as captured by the Lander Position Detection Camera (LPDC) aboard Chandrayaan-3 lander on 15 August 2023
-
View from the Lander Imager Camera-1 (LI-1) on 17 August 2023 just after the separation of the Chandrayaan-3 Lander Module from the Propulsion Module
-
Chandrayaan-3 orbital manoeuvre
Mission life
- Propulsion Module: Carries lander and rover to 100 by 100 kilometres (62 mi × 62 mi) orbit, with operation of experimental payload for up to 6 months.[52]
- Lander Module: 1 Lunar Day (14 Earth Days)[53]
- Rover Module: 1 Lunar Day (14 Earth Days)[53]
Team
- ISRO Chairperson: S. Somanath[7]
- Mission Director: S. Mohanakumar[54]
- Associate Mission Director: G. Narayanan[55]
- Project Director: P. Veeramuthuvel[56]
- Deputy Project Director: Kalpana. K[57]
- Vehicle Director: Biju C. Thomas[58]
Funding
In December 2019, ISRO requested the initial funding of the project, amounting to ₹75 crore (US$8.8 million), out of which ₹60 crore (US$7.0 million) would be for meeting expenditure towards machinery, equipment, and other capital expenditure, while the remaining ₹15 crore (US$1.8 million) was sought for operating expenditure.[59]
Confirming the existence of the project, ISRO's former chairman K. Sivan stated that the estimated cost would be around ₹615 crore (equivalent to ₹724 crore or US$85 million in 2023).[60][61][62]
See also
- Indian Human Spaceflight Programme
- Indian Martian Exploration Programme
- Venus Orbiter Mission – Indian Venus mission
- Aditya-L1 – Indian solar observation mission
- Gaganyaan – Indian crewed spacecraft project
References
- ^ "Chandrayaan-3 vs Russia's Luna-25 | Which one is likely to win the space race". cnbctv18.com. 14 August 2023. Archived from the original on 16 August 2023. Retrieved 16 August 2023.
- ^ "ISRO to launch moon mission Chandrayaan-3 on July 14. Check details". Hindustan Times. 6 July 2023. Archived from the original on 8 July 2023. Retrieved 6 July 2023.
- ^ "Chandrayaan-3 Launch LIVE Updates: Chandrayaan 3 successfully separated from LVM, injected to internal orbit". mint. 14 July 2023. Archived from the original on 17 July 2023. Retrieved 14 July 2023.
- ^ a b c d Jones, Andrew (23 August 2023). "Chandrayaan-3: India becomes fourth country to land on the moon". SpaceNews.com. Archived from the original on 23 August 2023. Retrieved 23 August 2023.
- ^ "Mission homepage". Archived from the original on 23 June 2023. Retrieved 29 June 2023.
- ^ "India launches Chandrayaan-3 mission to the lunar surface". Physicsworld. 14 July 2023. Archived from the original on 17 July 2023. Retrieved 15 July 2023.
- ^ a b c "Chandrayaan-3 just 1k-km from lunar surface". The Times of India. 11 August 2023. ISSN 0971-8257. Archived from the original on 12 August 2023. Retrieved 12 August 2023.
- ^ a b c "Chandrayaan-3 to cost Rs 615 crore, launch could stretch to 2021". The Times of India. 2 January 2020. Archived from the original on 19 November 2021. Retrieved 3 January 2020.
- ^ a b c "NASA – NSSDCA – Spacecraft – Details". Archived from the original on 8 June 2022. Retrieved 10 June 2022.
- ^ "Chandrayaan-3". www.isro.gov.in. Archived from the original on 10 July 2023. Retrieved 14 July 2023.
- ^ "Chandrayaan-3 launch on 14 July, lunar landing on 23 or 24 August". The Hindu. 6 July 2023. ISSN 0971-751X. Archived from the original on 11 July 2023. Retrieved 14 July 2023.
- ^ "India lands spacecraft near south pole of moon in historic first". The Guardian. Archived from the original on 23 August 2023. Retrieved 23 August 2023.
- ^ "What foreign media said on Chandrayaan-3's historic lunar feat". India Today. Archived from the original on 24 August 2023. Retrieved 23 August 2023.
- ^ "चंद्रयान-3: भारत ने रचा इतिहास, चंद्रमा के दक्षिणी ध्रुव पर की सफल लैंडिंग". Post Inshort (in Hindi). 23 August 2023. Archived from the original on 24 August 2023. Retrieved 23 August 2023.
- ^ "Chandrayaan-3 a shot in the arm for Gaganyaan-1". The Times of India. 15 July 2023. Archived from the original on 17 July 2023. Retrieved 15 July 2023.
- ^ Singh, Surendra (5 August 2018). "Chandrayaan-2 launch put off: India, Israel in lunar race for 4th position". The Times of India. Archived from the original on 19 August 2018. Retrieved 15 August 2018.
- ^ Shenoy, Jaideep (28 February 2016). "ISRO chief signals India's readiness for Chandrayaan II mission". The Times of India. Archived from the original on 20 July 2019. Retrieved 3 January 2020.
- ^ Guptan, Mahesh (16 November 2019). "How did Chandrayaan 2 fail? ISRO finally has the answer". The Week. Archived from the original on 19 February 2021. Retrieved 3 January 2020.
- ^ "ESA and Indian space agency ISRO agree on future cooperation". www.esa.int. Archived from the original on 21 March 2022. Retrieved 16 April 2022.
- ^ "Chandrayaan-3 Details". Indian Space Research Organisation. Archived from the original on 23 August 2023. Retrieved 24 August 2023.
- ^ Mehta, Jatan. "Chandrayaan-3 Makes Historic Touchdown on the Moon". Scientific American. Archived from the original on 24 August 2023. Retrieved 23 August 2023.
- ^ "Chandrayaan-3 in its last leg of journey to moon". India Today. Archived from the original on 21 August 2023. Retrieved 23 August 2023.
- ^ Kumar, Chethan (19 November 2019). "Chandrayaan-3 plans indicate failures in Chandrayaan-2". The Times of India. Archived from the original on 21 November 2019. Retrieved 15 September 2020.
- ^ a b After 4 Years, ISRO Reveals Why Chandrayaan 2 FAILED, archived from the original on 10 August 2023, retrieved 10 August 2023
- ^ Sharma, Shaurya (21 October 2022). "Chandrayaan-3 To Be More Robust, Have Contingency Systems Onboard, Says ISRO Chief". News18. Archived from the original on 22 October 2022. Retrieved 22 October 2022.
- ^ "NASA – NSSDCA – Spacecraft – Details". nssdc.gsfc.nasa.gov. Archived from the original on 8 June 2022. Retrieved 23 August 2023.
- ^ Livemint (16 August 2023). "Chandrayaan-3 highlights: Lander Vikram will be 30 km away from Moon today". mint. Archived from the original on 19 August 2023. Retrieved 23 August 2023.
- ^ Sharmila Kuthunur (23 August 2023). "India on the moon! Chandrayaan-3 becomes 1st probe to land near lunar south pole". Space.com. Archived from the original on 23 August 2023. Retrieved 23 August 2023.
- ^ a b "ISRO Chandrayaan 3 brochure" (PDF). Archived from the original (PDF) on 10 July 2023. Retrieved 14 July 2023.
- ^ "India's Chandrayaan-3 moon mission takes off with a successful launch as rocket hoists lunar lander and rover – CBS News". www.cbsnews.com. 14 July 2023. Archived from the original on 22 August 2023. Retrieved 23 August 2023.
- ^ "India launches its Chandrayaan-3 Moon landing mission". SpaceFlight Insider. 14 July 2023. Archived from the original on 17 August 2023. Retrieved 23 August 2023.
- ^ "Chandrayaan-3 update: Isro to fire up engines, put spacecraft on road to moon". India Today. Archived from the original on 1 August 2023. Retrieved 23 August 2023.
- ^ THE HINDU BUREAU (5 August 2023). "Chandrayaan-3 spacecraft enters lunar orbit". The Hindu. Archived from the original on 6 August 2023. Retrieved 6 August 2023.
- ^ Grey, Charles (6 August 2023). "India's Chandrayaan-3 Successfully Inserted Into Lunar Orbit". AIR SPACE News. Archived from the original on 6 August 2023. Retrieved 6 August 2023.
- ^ "Chandrayaan-3: Indian lunar lander Vikram inches closer to Moon". BBC News. 17 August 2023. Archived from the original on 23 August 2023. Retrieved 23 August 2023.
- ^ "India Is on the Moon: Lander's Success Moves Nation to Next Space Chapter". The New York Times. 23 August 2023. Archived from the original on 23 August 2023. Retrieved 23 August 2023.
- ^ Mehta, Jatan. "Chandrayaan-3 Makes Historic Touchdown on the Moon". Scientific American. Archived from the original on 24 August 2023. Retrieved 23 August 2023.
- ^ a b c "Chandrayaan-3". ISRO. Archived from the original on 10 July 2023. Retrieved 14 July 2023.
- ^ @isro (15 July 2023). "The first orbit raising operation" (Tweet). Retrieved 15 July 2023 – via Twitter.
- ^ @isro (17 July 2023). "The second orbit raising operation" (Tweet). Retrieved 17 July 2023 – via Twitter.
- ^ @isro (18 July 2023). "The third orbit raising operation" (Tweet). Retrieved 18 July 2023 – via Twitter.
- ^ @isro (20 July 2023). "The fourth orbit raising operation" (Tweet). Retrieved 20 July 2023 – via Twitter.
- ^ @isro (25 July 2023). "The fifth orbit raising operation" (Tweet). Retrieved 25 July 2023 – via Twitter.
- ^ @isro (1 August 2023). "Chandrayaan-3 update" (Tweet). Retrieved 5 August 2023 – via Twitter.
- ^ @isro (4 August 2023). "Lunar Orbit Injection (LOI)" (Tweet). Retrieved 5 August 2023 – via Twitter.
- ^ @isro (6 August 2023). "Chandrayaan-3 Mission" (Tweet). Retrieved 6 August 2023 – via Twitter.
- ^ @isro (9 August 2023). "Chandrayaan-3 Mission" (Tweet). Retrieved 9 August 2023 – via Twitter.
- ^ @isro (14 August 2023). "Chandrayaan-3 Mission" (Tweet). Retrieved 14 August 2023 – via Twitter.
- ^ @isro (16 August 2023). "Chandrayaan-3 Mission" (Tweet). Retrieved 16 August 2023 – via Twitter.
- ^ @isro (18 August 2023). "Chandrayaan-3 Mission" (Tweet). Retrieved 18 August 2023 – via Twitter.
- ^ @isro (19 August 2023). "Chandrayaan 3 mission: second and final deorbiting operation" (Tweet) – via Twitter.
- ^ "Chandrayaan-3 Brochure" (PDF). Indian Space Research Organisation. Archived (PDF) from the original on 10 July 2023.
- ^ a b "Chandrayaan-3 Brochure" (PDF). Indian Space Research Organisation. Archived (PDF) from the original on 10 July 2023.
- ^ "With Chandrayaan-3 set to land today, meet key scientists behind ISRO moon mission". The Indian Express. 23 August 2023. Archived from the original on 24 August 2023. Retrieved 23 August 2023.
- ^ Nirvaan (4 August 2023). "Chandrayaan 3 Price, Budget, Cost, (Orbiter, Lander, and Rover)". PM Sarkari Yojana Hindi. Archived from the original on 24 August 2023. Retrieved 23 August 2023.
- ^ "Chandrayaan-3 | Not just sons of Tamil Nadu but State's soil itself contributed to Moon mission". The Hindu. 23 August 2023. ISSN 0971-751X. Retrieved 23 August 2023.
- ^ Online |, E. T. (23 August 2023). "Most memorable moment for team Chandrayaan-3: Kalpana K, Deputy Project Director, Moon Mission". The Economic Times. Archived from the original on 24 August 2023. Retrieved 23 August 2023.
- ^ "Chandrayaan 3 Launch Live: India's Chandrayaan-3 moon mission lifts off from Sriharikota". The Times of India. 14 July 2023. Archived from the original on 17 July 2023. Retrieved 14 July 2023.
- ^ Kumar, Chethan (8 December 2019). "ISRO seeks 75 crore more from Centre for Chandrayaan-3". The Times of India. Archived from the original on 20 January 2021. Retrieved 8 December 2019.
- ^ "Chandrayaan-3 to cost Rs 615 crore, launch could stretch to 2021". The Times of India. 2 January 2020. Archived from the original on 30 December 2020. Retrieved 3 January 2020.
- ^ "How much did India's Chandrayaan-3 lunar mission cost?". CNBC. 15 July 2023. Archived from the original on 17 July 2023. Retrieved 15 July 2023.
- ^ Mike Wall (18 August 2023). "India's Chandrayaan-3 snaps close-up photos of moon ahead of landing try (video)". Space.com. Archived from the original on 23 August 2023. Retrieved 22 August 2023.