WikiProject iconTrains: Rapid transit C‑class Mid‑importance
WikiProject iconThis article is within the scope of WikiProject Trains, an attempt to build a comprehensive and detailed guide to rail transport on Wikipedia. If you would like to participate, you can visit the project page, where you can join the project and/or contribute to the discussion. See also: WikiProject Trains to do list and the Trains Portal.
CThis article has been rated as C-class on Wikipedia's content assessment scale.
MidThis article has been rated as Mid-importance on the project's importance scale.
Associated projects or task forces:
Taskforce icon
This article is supported by WikiProject Rapid transit.

Template:SG

Transfer Stations

The masterplan map, here http://en.wikipedia.org/wiki/Image:Singapore_mrt_lrt_map_future_version4.png shows this line with only two transfer locations which are at the two ends. The line crosses half the island and intersects with four other lines. It seems insane that they would plan this and not include a few transfers to those lines that are being crossed. If indeed the only way to get on this line is to transfer onto it from one of its ends, then it will be a pain to use and an undesirable place to live if you want to be able to get places quickly via the MRT.

I realize this line is still being studied, but the map has some serious dissapointments in it if changes are not made. This article mentions the Eastern Region Line having 12 stations. I only see eight listed on the map.

Would it be possible to get a list of those stations on this article?

Also, how will it be linked to the Thomson Line? Will the trains go straight through or will passengers have to switch trains? I understand that these two lines need to be referred to separately because they are being built as two separate projects, but it would make sense to treat them as one line operationally? Is one an extension of the other or are they really two completely different lines requiring a greater infrastructure cost and usage hassle at Marina Bay?

DaronDierkes (talk) 05:58, 8 March 2008 (UTC)[reply]

The "masterplan map" u linked above is not an official map. It is the creation of rail fans on wikipedia. Transfer locations for the line have not yet been announced by the transport planners in Singapore. The same can be said of the station locations, thus non of the station names are being listed on the article as they cannot be reliably sourced. As to how it would be linked to the Thomson MRT Line, your guess is as good as mine. Whether they would operate as 2 different systems or just simply be an "extension" of each other would not be known until more details are released in the future. What we do know for sure now, is that these are officially 2 separate lines and thus the 2 separate articles. :) - oahiyeel talk 06:26, 8 March 2008 (UTC)[reply]

changi airport

can we listed it as a confirmed interchange station as per this map? -220.255.2.56 (talk) 15:34, 26 December 2012 (UTC)[reply]

Four-in-one train and bus depot?

In Stage 5 (2024):

What is a "four-in-one train and bus depot"? It looks from the article that the depot will house two modes, rail and bus. Even if there are three rail lines supported, that would not be separate modes, unless the rail systems are incompatible with one another. Please clarify. Thisisnotatest (talk) 01:42, 30 August 2015 (UTC)[reply]

If I'm not wrong it would house trains from the EWL (6 cars), DTL (3 cars), and TEL (4 cars) and therefore are not compatible with one another. Hope this answers your question. 1.02 editor (talk) 09:28, 28 September 2017 (UTC) 1.02 editor (talk) 09:28, 28 September 2017 (UTC)[reply]

Signalling

It states in the article that the line is going to be using Alstom Urbalis 400 signalling. However, the sources listed state that the contract was given to GE Transportation, which, as stated, was going to supply its Tempo signalling system, and I have found no reliable sources supporting the claim the article makes. As GE Transportation sold its signalling division to Alstom in 2015, the signalling would be supplied by Alstom, but where can it be found that it is the Urbalis 400 signalling? Please explain. R22-3877 (talk) 10:18, 29 August 2017 (UTC)[reply]

Hello fellow Wikipedians,

I have just modified 4 external links on Thomson-East Coast MRT Line. Please take a moment to review my edit. If you have any questions, or need the bot to ignore the links, or the page altogether, please visit this simple FaQ for additional information. I made the following changes:

When you have finished reviewing my changes, you may follow the instructions on the template below to fix any issues with the URLs.

This message was posted before February 2018. After February 2018, "External links modified" talk page sections are no longer generated or monitored by InternetArchiveBot. No special action is required regarding these talk page notices, other than regular verification using the archive tool instructions below. Editors have permission to delete these "External links modified" talk page sections if they want to de-clutter talk pages, but see the RfC before doing mass systematic removals. This message is updated dynamically through the template {{source check}} (last update: 5 June 2024).

  • If you have discovered URLs which were erroneously considered dead by the bot, you can report them with this tool.
  • If you found an error with any archives or the URLs themselves, you can fix them with this tool.

Cheers.—InternetArchiveBot (Report bug) 15:54, 20 October 2017 (UTC)[reply]

The Shell stations

Should we mention the shell stations? unlike DT4, there is no station code reserved for them. However, the recently updated official LTA map (accidentally?) showed one of the shell station as TE22A Gardens Bay East. In this case, should we also include the other shell station (presumably TE4A)?

For NS6, NE2 and DT4, we do not list the name because these names were never announced (NS6 might have been named in an old newspaper in the 90s but this is not confirmed). However, for TE4A, the LTA contracts refer to the station as TGR. The signs by LTA uses Tagora (there is no name used for DT4 during construction based on Google Maps, Hume is only shown in concept arts). So technically there is a name for the station (like Bukit Brown). Thoughts? -115.66.196.146 (talk) 15:27, 26 May 2018 (UTC)[reply]

Ah yes, about TE22A, its official name for the code, is Founder's Memorial. Thanks 115.066.196.146!

Rolling Stock

There is no section on the CT251 on the article and it needs to be added thanks (sorry I have no time to do it myself). 1.02 editor (C651 set 217/218) 11:48, 4 October 2018 (UTC)[reply]