Jump to content

Toh Guan MRT station: Difference between revisions

Coordinates: 1°20′23″N 103°44′33″E / 1.33984°N 103.7425°E / 1.33984; 103.7425
From Wikipedia, the free encyclopedia
Content deleted Content added
Standardization
No edit summary
Line 22: Line 22:
| other=
| other=
| structure=Elevated
| structure=Elevated
| platforms=Island
| platforms=2 ([[1 island platform]])
| depth=
| depth=
| levels=1
| levels=1
Line 37: Line 37:
| rebuilt=
| rebuilt=
| electrified=Yes
| electrified=Yes
| ADA=Yes
| accessible=Yes
| operator=
| operator=
| owned=[[Land Transport Authority]]
| owned=[[Land Transport Authority]]

Revision as of 10:49, 21 March 2023

 JE4 
Toh Guan
卓源
டோ குவான்
Future Mass Rapid Transit (MRT) station
Toh Guan MRT station site
General information
Coordinates1°20′23″N 103°44′33″E / 1.33984°N 103.7425°E / 1.33984; 103.7425
Owned byLand Transport Authority
Line(s)
Platforms2 (1 island platform)
Tracks2
Construction
Structure typeElevated
Platform levels1
ParkingYes
Bicycle facilitiesYes
AccessibleYes
History
Opening2028; 4 years' time (2028)
ElectrifiedYes
Services
Preceding station Mass Rapid Transit Following station
Bukit Batok West
towards Choa Chu Kang or Tawas
Jurong Region Line
Pandan
Jurong East
towards Boon Lay or Tawas
Location
Singapore MRT/LRT system map
Singapore MRT/LRT system map
Toh Guan
Toh Guan station in Singapore

Toh Guan MRT station is a future elevated Mass Rapid Transit (MRT) station on the Jurong Region line (JRL) in Jurong East, Singapore.[1][2][3] Announced on 9 May 2018, it will be constructed as part of Phase 2 of the JRL.

The station is located in the Jurong East planning area at the junction of Toh Guan Road and Jurong East Avenue 1 to the north.

History

On 9 May 2018, LTA announced that Toh Guan station would be part of the proposed Jurong Region line (JRL). The station will be constructed as part of Phase 2, JRL (East), consisting of 7 stations between Tengah and Pandan Reservoir, and is expected to be completed in 2028.[4]

Contract J109 for the design and construction of Toh Guan Station and associated viaducts was awarded to Daewoo Engineering & Construction Co. Pte Ltd - Yongnam Engineering and Construction Pte Ltd Joint Venture at a sum of S$320.4 million in July 2020. Construction is expected to start in 2020. Contract J109 also includes the design and construction of the Jurong Town Hall and Pandan Reservoir stations and the 3.6-kilometre (2.2-mile) associated viaducts.[5][6][7][8]

Initially expected to open in 2027, the restrictions on the construction due to the COVID-19 pandemic has led to delays in the JRL line completion, and the date was pushed to 2028.[9]

Location

The station complex will be straddled over the existing Jurong East Central, with the junction with Toh Guan Road and Jurong East Avenue 1 to the north, and the junction with Jurong East Street 21 to the south. It is located in the Jurong East planning area between the Yuhua East and Toh Guan Subzones,[10] parallel to the North South line approach tracks to Jurong East station, nested within housing estates.

Access to the station will be via 2 exits on each side of Jurong East Central.[11]

References

  1. ^ "Jurong Region Line to serve NTU, Tengah estate, Jurong Industrial Estate - CNA". 21 September 2019. Archived from the original on 21 September 2019. Retrieved 21 September 2019.
  2. ^ "Residents and students welcome Jurong Region Line but find it confusing". 21 September 2019. Archived from the original on 21 September 2019. Retrieved 21 September 2019.
  3. ^ "Jurong Region Line". 21 September 2019. Archived from the original on 21 September 2019. Retrieved 21 September 2019.
  4. ^ "Joint News Release by the Land Transport Authority (LTA) & SLA - Jurong Region Line: Enhancing Connectivity in the West | Press Room | Land Transport Authority". 21 September 2019. Archived from the original on 21 September 2019. Retrieved 21 September 2019.
  5. ^ "Land Transport Authority on Instagram: The contract for the construction of 3 stations for Jurong Region Line". Instagram. Archived from the original on 26 December 2021. Retrieved 17 July 2020.
  6. ^ "LTA | News Room | news-releases | LTA Awards Four Jurong Region Line Contracts". www.lta.gov.sg. Archived from the original on 17 July 2020. Retrieved 17 July 2020.
  7. ^ "LTA awards 4 Jurong Region Line contracts worth more than S$682 million". CNA. Archived from the original on 17 July 2020. Retrieved 17 July 2020.
  8. ^ Tan, Cheryl (17 July 2020). "LTA awards four contracts totalling $682.5 million for the Jurong Region Line". The Straits Times. Retrieved 18 July 2020.
  9. ^ "Written Reply by Minister for Transport Ong Ye Kung to Parliamentary Question on Prioritising Early Completion of Jurong Region MRT Line". www.mot.gov.sg. 1 February 2021. Retrieved 24 March 2021.
  10. ^ "Singapore's Jurong East Planning Area". Key Location. Retrieved 21 September 2019.
  11. ^ "Jurong Region Line". 21 September 2019. Archived from the original on 21 September 2019. Retrieved 21 September 2019.