Bedok South MRT station: Difference between revisions
No edit summary |
→top: Remove usage of radioactive material glyph. See talk page for discussion. |
||
Line 14: | Line 14: | ||
| terminicode = |
| terminicode = |
||
}} |
}} |
||
| type = Future [[Mass Rapid Transit (Singapore)|Mass Rapid Transit]] (MRT) station |
| type = Future [[Mass Rapid Transit (Singapore)|Mass Rapid Transit]] (MRT) station |
||
| image=File:TE30 Bedok South MRT construction 20201114 171313.jpg |
| image=File:TE30 Bedok South MRT construction 20201114 171313.jpg |
||
| image_caption=Construction site of Bedok South station in November 2020 |
| image_caption=Construction site of Bedok South station in November 2020 |
Revision as of 17:38, 16 December 2021
TE30
Bedok South 勿洛南 பிடோக் சவுத் | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Future Mass Rapid Transit (MRT) station | |||||||||||
General information | |||||||||||
Coordinates | 1°19′00″N 103°56′54″E / 1.316613°N 103.948276°E | ||||||||||
Owned by | Land Transport Authority | ||||||||||
Operated by | SMRT Trains (SMRT Corporation) | ||||||||||
Line(s) | |||||||||||
Platforms | 2 (1 island platform) | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Structure type | Underground | ||||||||||
Depth | 22m | ||||||||||
Platform levels | 2 | ||||||||||
Accessible | Yes | ||||||||||
History | |||||||||||
Opening | 2025 | ||||||||||
Services | |||||||||||
| |||||||||||
|
Bedok South MRT station is a future underground Mass Rapid Transit station on the Thomson–East Coast Line in Bedok planning area, Singapore.[1]
The station will be located next to Temasek Secondary School, at the intersection of Upper East Coast Road and Bedok South Road.
History
On 15 August 2014, LTA announced that Bedok South station would be part of the proposed Thomson East-Coast line (TEL). The station will be constructed as part of Stage 5, consisting of 2 stations between Bedok South and Sungei Bedok, and is expected to be completed in 2025.[2][3]
Contract T311 for the design and construction of Bedok South Station and associated tunnels was awarded to China Jingye Engineering Corporation Limited (Singapore Branch) at a sum of S$188 million on April 2016. Construction started in 2016.[4]
Stage 5 of the TEL is now slated to commence passenger service in 2025 instead of 2024 due to the COVID-19 pandemic.[5]
References
- ^ "Stages of Thomson–East Coast Line". Land Transport Authority. 15 August 2014.
- ^ "Joint News Release by the Land Transport Authority & Singapore Land Authority - Thomson-East Coast Line: New MRT Links in the East | Press Room | Land Transport Authority". 2014-08-19. Archived from the original on 2014-08-19. Retrieved 2020-02-13.
- ^ "LTA | Upcoming Projects | Rail Expansion | Thomson-East Coast Line". 2020-02-13. Archived from the original on 2020-02-13. Retrieved 2020-02-13.
- ^ "LTA | News Room | News Releases | LTA Awards Two Contracts for Thomson-East Coast Line's Amber and Bedok South Stations". www.lta.gov.sg. Retrieved 2020-02-13.
- ^ "Written Reply by Minister for Transport Ong Ye Kung to Parliamentary Question on Updates on Thomson East Coast Line, Jurong Region Line and Cross Island Line". Land Transport Authority. Retrieved 17 May 2021.