Jump to content

North Triangle Common Station: Difference between revisions

Coordinates: 14°39′21″N 121°1′41″E / 14.65583°N 121.02806°E / 14.65583; 121.02806
From Wikipedia, the free encyclopedia
Content deleted Content added
Rescuing 2 sources and tagging 0 as dead.) #IABot (v2.0.9.5) (Eastmain - 19562
AnomieBOT (talk | contribs)
Rescuing orphaned refs ("untv" from rev 1266213477)
(22 intermediate revisions by 14 users not shown)
Line 4: Line 4:
{{Use mdy dates|date=June 2020}}
{{Use mdy dates|date=June 2020}}
{{Infobox station
{{Infobox station
| name = North Triangle Common Station
| name = North Triangle Common Station
{{Infobox station/Header MRT7
| other_name = North Avenue Common Station<br>Unified Grand Central Common Station
| type =
|name = North EDSA
|line_name = 7
| image = North Avenue Common Station Area A 2023-10-29.jpg
|station_number = S01
| image_caption = The construction progress of Area A in October 2023
}}
| address = {{ubl|[[EDSA]], [[Bagong Pag-asa]]<br>(LRT-1 and MRT-3)|[[North Avenue, Quezon City|North Avenue]], [[Bagong Pag-asa]] (MRT-7)}} [[Quezon City]], [[Metro Manila]]
| country = [[Philippines]]
| other_name = {{plainlist|
* North Avenue
| operator = {{plainlist|
* North EDSA (MRT-7)<ref name="Korail-MRT7">{{Cite web |last=한국철도TV |title=필리핀 기차, 한국철도 기술을 담다 🚄 {{!}} KORAIL PHILIPPINE BRANCH |url=https://www.youtube.com/watch?v=eDfwIxFrs-s |access-date=2022-12-21 |website=YouTube |date=November 18, 2022 |language=en |archive-date=December 21, 2022 |archive-url=https://web.archive.org/web/20221221115845/https://www.youtube.com/watch?v=eDfwIxFrs-s |url-status=live }}</ref>
* North Triangle
* Unified Grand Central Station
}}
| type =
| image = North Avenue Common Station Area A 2023-10-29.jpg
| image_caption = The construction progress of Area A in October 2023
| address = {{ubl|[[EDSA]], [[Bagong Pag-asa]]<br>(LRT-1 and MRT-3)|[[North Avenue, Quezon City|North Avenue]], [[Bagong Pag-asa]] (MRT-7)}} [[Quezon City]], [[Metro Manila]]
| country = [[Philippines]]
| operator = {{plainlist|
* [[Department of Transportation (Philippines)|Department of Transportation]]
* [[Department of Transportation (Philippines)|Department of Transportation]]
* [[Light Rail Manila Corporation]]
* [[Light Rail Manila Corporation]]
* [[Metro Rail Transit Corporation]]
* [[Metro Rail Transit Corporation]]
* [[San Miguel Corporation|SMC-Mass Rail Transit 7 Incorporated]]
* [[San Miguel Corporation|SMC Mass Rail Transit 7 Incorporated]]
}}
}}
| line = {{plainlist|
| line = {{plainlist|
* {{rail color box|system=Manila LRT|line=1|inline=yes}}
* {{rail color box|system=Manila LRT|line=1|inline=yes}}
* {{rail color box|system=Manila MRT|line=3|inline=yes}}
* {{rail color box|system=Manila MRT|line=3|inline=yes}}
* {{rail color box|system=Manila MRT|line=7|inline=yes}}
* {{rail color box|system=Manila MRT|line=7|inline=yes}}
}}
}}
| tracks = 7
| tracks = 7
{{bullet list
{{bullet list
| 2 for [[LRT Line 1 (Metro Manila)|Line 1]]
| 2 for [[LRT Line 1 (Metro Manila)|Line 1]]
| 2 for [[MRT Line 3 (Metro Manila)|Line 3]]
| 2 for [[MRT Line 3 (Metro Manila)|Line 3]]
| 3 for [[MRT Line 7|Line 7]]}}
| 3 for [[MRT Line 7|Line 7]]}}
| other = '''Future:''' ''{{rint|manila|9}} [[North Avenue station (Metro Manila Subway)|North Avenue]]''
| other = '''Future:''' ''{{rint|manila|9}} [[North Avenue station (Metro Manila Subway)|North Avenue]]''
| structure = Elevated
| structure = Elevated
| platform = [[Side platform|Side]] and [[Island platform|island]] platforms
| platform = [[Side platform|Side]] and [[Island platform|island]] platforms
| parking = Yes ([[TriNoma]], [[SM City North EDSA]])
| parking = Yes ([[Trinoma]], [[SM North EDSA]])
| bicycle =
| bicycle =
| passengers = 478,000 (projected)<ref>{{Cite web|first=Clara|last=Rosales|title=LOOK: The Common Station Connecting Metro Trains is Almost Complete|url=https://www.reportr.world/news/dotr-unified-grand-central-common-station-nears-completion-2022-a4373-20220615|work=reportr.world|access-date=June 9, 2022|date=June 9, 2022}}</ref>
| passengers = 478,000 (projected)<ref>{{Cite web|first=Clara|last=Rosales|title=LOOK: The Common Station Connecting Metro Trains is Almost Complete|url=https://www.reportr.world/news/dotr-unified-grand-central-common-station-nears-completion-2022-a4373-20220615|work=reportr.world|access-date=June 9, 2022|date=June 9, 2022}}</ref>
| baggage_check =
| baggage_check =
| pass_year =
| pass_year =
| pass_percent =
| pass_percent =
| opened =
| opened =
| rebuilt =
| rebuilt =
| former = Metro Manila Integrated Rail Terminal
| former =
| status = ''Under construction''
| status = ''Under construction''
| code = S01 (MRT-7)
| opening = 2024 (partial)<ref name="untv">{{cite interview|last=Chavez|first=Cesar|interviewer=JP Nuñez|title=Common Station na magdurugtong sa MRT-3 at LRT-1, planong buksan sa Hunyo – DOTr|trans-title=Common Station that will connect MRT Line 3 and LRT Line 1, planned to open in June – DOTr|language=Filipino|work=[[Ito Ang Balita]]|date=20 February 2023|publisher=[[UNTV (Philippines)|UNTV News and Rescue]]|location=Philippines|url=https://www.youtube.com/watch?v=Ip6DpFpD9lA|access-date=21 February 2023}}{{unreliable source?|date=October 2023|reason=User-generated sources are unreliable sources.}}</ref><br>2025 (full)<ref name="untv" />
| opening = January 2025 (partial)<ref name=":1" />
| services = {{Adjacent stations
| services = {{Adjacent stations
|system1 = Manila LRT
|system1 = Manila LRT
|line1 = 1|right1 = Fernando Poe Jr.
|line1 = 1|right1 = Fernando Poe Jr.
Line 48: Line 59:
|line3 = 7|right3 = Quezon Memorial Circle
|line3 = 7|right3 = Quezon Memorial Circle
}}
}}
| ADA =
| accessible =
| code =
| owned = {{plainlist|
| owned = {{plainlist|
* [[Department of Transportation (Philippines)|Department of Transportation]]
* [[Department of Transportation (Philippines)|Department of Transportation]]
* [[Metro Rail Transit Corporation]]
* [[Metro Rail Transit Corporation]]
}}
}}
| zone =
| zone =
| map =
| map =
}}
}}


The '''North Triangle Common Station'''<ref>{{Cite web|title=Take a look at the North Avenue Common Station project|url=https://philkotse.com/market-news/north-avenue-common-station-update-10152|access-date=2021-04-26|website=philkotse.com|language=en}}</ref><ref>{{Cite web|title=North Triangle Common Station|url=https://www.visionarch-architects.com/north-triangle-common-station|access-date=2021-04-26|website=Visionarch|language=en}}</ref> (official temporary designation: '''''Unified Grand Central Station''''',<ref name="called">{{cite news |last=Gonzales |first=Yuji Vincent |title=What will the MRT-LRT common station be called? |url=https://newsinfo.inquirer.net/863647/what-will-the-mrt-lrt-common-station-be-called |access-date=January 19, 2017 |work=Inquirer.net |date=January 19, 2017}}</ref> also called '''Grand Central Station'''), popularly known as the '''Common Station''', is an under-construction<ref>{{cite news |url=https://cnnphilippines.com/transportation/2017/09/29/lrt-mrt-common-station-groundbreaking.html |title=LRT-MRT common station breaks ground |work=CNN Philippines |access-date=April 10, 2018 |author=Jiao, Claire |date=September 29, 2017 |language=en |archive-date=April 11, 2018 |archive-url=https://web.archive.org/web/20180411025750/http://cnnphilippines.com/transportation/2017/09/29/lrt-mrt-common-station-groundbreaking.html |url-status=dead }}</ref> [[rapid transit]] [[train station#Terminus|terminal]] and transport hub that will connect [[LRT Line 1 (Metro Manila)|LRT Line 1]], [[MRT Line 3 (Metro Manila)|MRT Line 3]], and [[MRT Line 7 (Metro Manila)|MRT Line 7]],<ref name="DOTCbid" /> and the nearby [[Metro Manila Subway]].<ref name="PNA-DOTr Ink">{{Cite news |last=Pateña |first=Aerol John |date=2019-02-13 |title=DOTr inks deal on common station construction |language=en |work=Philippine News Agency |url=https://www.pna.gov.ph/articles/1061843 |access-date=2022-02-22}}</ref><ref name="DOTr-Mar22">{{Cite web |last=Department of Transportation |date=2022-03-07 |title=DOTr - CONSTRUCTION OF COMMON STATION STRUCTURE TO BE COMPLETED BY END OF MARCH 2022 – TUGADE |url=https://dotr.gov.ph/55-dotrnews/4299-construction-of-common-station-structure-to-be-completed-by-end-of-march-2022-tugade.html |access-date=2022-03-31 |website=dotr.gov.ph |archive-date=March 8, 2022 |archive-url=https://web.archive.org/web/20220308091040/https://dotr.gov.ph/55-dotrnews/4299-construction-of-common-station-structure-to-be-completed-by-end-of-march-2022-tugade.html |url-status=dead }}</ref> It is located in [[Bagong Pag-asa]], [[Quezon City]], [[Philippines]], and is named after its location, which is at the corner of [[EDSA]] and [[North Avenue, Quezon City|North Avenue]].<ref name="DOTCrevs">{{cite news |last=Montecillo |first=Paolo G. |title=DOTC reviews MRT-LRT central station project |url=http://business.inquirer.net/6925/dotc-reviews-mrt-lrt-central-station-project |access-date=October 24, 2012 |newspaper=Inquirer.net |date=July 13, 2011}}</ref>
The '''North Triangle Common Station'''<ref>{{Cite web|title=Take a look at the North Avenue Common Station project|url=https://philkotse.com/market-news/north-avenue-common-station-update-10152|access-date=2021-04-26|website=philkotse.com|language=en}}</ref><ref>{{Cite web|title=North Triangle Common Station|url=https://www.visionarch-architects.com/north-triangle-common-station|access-date=2021-04-26|website=Visionarch|language=en}}</ref>, officially designated as the '''Unified Grand Central Station'''<ref name="called">{{cite news |last=Gonzales |first=Yuji Vincent |title=What will the MRT-LRT common station be called? |url=https://newsinfo.inquirer.net/863647/what-will-the-mrt-lrt-common-station-be-called |access-date=January 19, 2017 |work=Inquirer.net |date=January 19, 2017}}</ref> and '''North EDSA''' for the MRT Line 7<ref name="Korail-MRT7" />, commonly known as the '''Common Station''' or '''North Triangle station''', is an under-construction<ref>{{cite news |url=https://cnnphilippines.com/transportation/2017/09/29/lrt-mrt-common-station-groundbreaking.html |title=LRT-MRT common station breaks ground |work=CNN Philippines |access-date=April 10, 2018 |author=Jiao, Claire |date=September 29, 2017 |language=en |archive-date=April 11, 2018 |archive-url=https://web.archive.org/web/20180411025750/http://cnnphilippines.com/transportation/2017/09/29/lrt-mrt-common-station-groundbreaking.html |url-status=dead }}</ref> [[rapid transit]] [[train station#Terminus|terminal]] and transport hub that will connect [[LRT Line 1 (Metro Manila)|LRT Line 1]], [[MRT Line 3 (Metro Manila)|MRT Line 3]], and [[MRT Line 7 (Metro Manila)|MRT Line 7]],<ref name="DOTCbid" /> and the nearby [[Metro Manila Subway]].<ref name="PNA-DOTr Ink">{{Cite news |last=Pateña |first=Aerol John |date=2019-02-13 |title=DOTr inks deal on common station construction |language=en |work=Philippine News Agency |url=https://www.pna.gov.ph/articles/1061843 |access-date=2022-02-22}}</ref><ref name="DOTr-Mar22">{{Cite web |last=Department of Transportation |date=2022-03-07 |title=DOTr - CONSTRUCTION OF COMMON STATION STRUCTURE TO BE COMPLETED BY END OF MARCH 2022 – TUGADE |url=https://dotr.gov.ph/55-dotrnews/4299-construction-of-common-station-structure-to-be-completed-by-end-of-march-2022-tugade.html |access-date=2022-03-31 |website=dotr.gov.ph |archive-date=March 8, 2022 |archive-url=https://web.archive.org/web/20220308091040/https://dotr.gov.ph/55-dotrnews/4299-construction-of-common-station-structure-to-be-completed-by-end-of-march-2022-tugade.html |url-status=dead }}</ref> It is located in [[Bagong Pag-asa]], [[Quezon City]], [[Philippines]], and is named after its location, which is at the corner of [[EDSA]] and [[North Avenue, Quezon City|North Avenue]].<ref name="DOTCrevs">{{cite news |last=Montecillo |first=Paolo G. |title=DOTC reviews MRT-LRT central station project |url=http://business.inquirer.net/6925/dotc-reviews-mrt-lrt-central-station-project |access-date=October 24, 2012 |newspaper=Inquirer.net |date=July 13, 2011}}</ref>


The common alignment had been in limbo for years since the Department of Transportation and Communications (DOTC), now [[Department of Transportation (Philippines)|Department of Transportation]] (DOTr), reviewed the project's technical and financial components.<ref name="SM and Ayala">{{cite news |last=Marasigan |first=Lorenz S. |title=SM ready to end feud with Ayala |url=http://www.businessmirror.com.ph/sm-ready-to-end-feud-with-ayala/ |work=BusinessMirror |date=February 25, 2015}}</ref> It was in January 2017 that an agreement was reached to build the station. The groundbreaking of the station was held at the North Triangle Transport Terminal in September 2017. The station was expected to fully open in January 2021 but has now been targeted to 2025, with partial operations for MRT-3 and LRT-1 slated for the end of 2023.<ref name=":0" />
The common alignment had been in limbo for years since the Department of Transportation and Communications (DOTC), now [[Department of Transportation (Philippines)|Department of Transportation]] (DOTr), reviewed the project's technical and financial components.<ref name="SM and Ayala">{{cite news |last=Marasigan |first=Lorenz S. |title=SM ready to end feud with Ayala |url=http://www.businessmirror.com.ph/sm-ready-to-end-feud-with-ayala/ |work=BusinessMirror |date=February 25, 2015}}</ref> It was in January 2017 that an agreement was reached to build the station. The groundbreaking of the station was held at the North Triangle Transport Terminal in September 2017. The station was initially expected to fully open in January 2021, but repeated delays have set back its opening to January 2025.<ref name=":0" /><ref name=":1">{{Cite AV media |url=https://www.youtube.com/watch?v=1S9VjHM5B3Q |title=Mga railway project ng gobyerno, kumusta na ngayon? (Full Episode) {{!}} Reporter’s Notebook |date=2024-10-07 |last=GMA Public Affairs |access-date=2024-10-08 |via=YouTube}}</ref>


==History==
==History==
Line 71: Line 81:
However, at the start of 2013, Roxas' successor, [[Joseph Emilio Abaya]] announced that the government has cancelled and abandoned the project indefinitely because the construction of the common station was supposed to be completed back in May 2010 during the presidency of [[Gloria Macapagal Arroyo]] but disputes over cost, engineering issues and naming rights caused due to the halting of the project by Arroyo's successor President Benigno Aquino III on January 2, 2013.
However, at the start of 2013, Roxas' successor, [[Joseph Emilio Abaya]] announced that the government has cancelled and abandoned the project indefinitely because the construction of the common station was supposed to be completed back in May 2010 during the presidency of [[Gloria Macapagal Arroyo]] but disputes over cost, engineering issues and naming rights caused due to the halting of the project by Arroyo's successor President Benigno Aquino III on January 2, 2013.


On January 9, 2013, Abaya announced that the government has filed for the candidacies for three sites of the common station linking three rapid transit systems for Metro Manila, DOTC is not keen on build the common station in front of the Annex Building of the [[SM City North EDSA]] shopping mall, adding that other potential locations are the TriNoma mall and the [[Malvar station|Malvar LRT station]] in [[Caloocan]]. Abaya said the agency is awaiting the results of a study that would determine the final location of the common station. He had said the original design near SM City North EDSA Annex was "ineffective and costly" because the rails of Line 3 would have to be extended and trains would have to be added.<ref>{{cite news |title=DOTC to choose among 3 possible sites for common train station |url=http://www.interaksyon.com/business/52281/dotc-to-choose-among-3-possible-sites-for-common-train-station |url-status=dead |archive-url=https://web.archive.org/web/20170202014513/http://www.interaksyon.com/business/52281/dotc-to-choose-among-3-possible-sites-for-common-train-station |archive-date=February 2, 2017 |author=Amojelar, Darwin G. |date=January 9, 2013}}</ref>
On January 9, 2013, Abaya announced that the government has filed for the candidacies for three sites of the common station linking three rapid transit systems for Metro Manila, DOTC is not keen on build the common station in front of the Annex Building of the [[SM North EDSA]] shopping mall, adding that other potential locations are the TriNoma mall and the [[Malvar station|Malvar LRT station]] in [[Caloocan]]. Abaya said the agency is awaiting the results of a study that would determine the final location of the common station. He had said the original design near SM City North EDSA Annex was "ineffective and costly" because the rails of Line 3 would have to be extended and trains would have to be added.<ref>{{cite news |title=DOTC to choose among 3 possible sites for common train station |url=http://www.interaksyon.com/business/52281/dotc-to-choose-among-3-possible-sites-for-common-train-station |url-status=dead |archive-url=https://web.archive.org/web/20170202014513/http://www.interaksyon.com/business/52281/dotc-to-choose-among-3-possible-sites-for-common-train-station |archive-date=February 2, 2017 |author=Amojelar, Darwin G. |date=January 9, 2013}}</ref>


On November 21, 2013, the NEDA board, chaired by President [[Benigno Aquino III]], approved the construction of a common station within North Avenue between [[SM City North EDSA]] and [[TriNoma]], estimated to cost {{Philippine peso|1.4 billion}}. The station was set to feature head-to-head platforms for LRT 1 and MRT 3 trains with a {{convert|147.4|m|ftin|adj=on|abbr=on}} elevated walkalator to MRT 7,<ref name="commonterminal">{{cite news|author=Tan, Kimberly Jane|date=November 21, 2013|title=NEDA approves MRT 7, LRT-1 extension projects|publisher=[[GMA News and Public Affairs]]|url=https://www.gmanetwork.com/news/story/336540/economy/business/neda-approves-mrt-7-lrt-extension-projects|access-date=January 1, 2014}}</ref> inconsistent with the original plan of having seamless connectivity to Monumento and is also an unusual arrangement of having two train stations beside each other.<ref>{{cite news|last1=Marasigan|first1=Gelo|last2=Remitio|first2=Rex|date=September 28, 2016|title=Finally: A common station for LRT, MRT lines|work=CNN Philippines|url=https://cnnphilippines.com/metro/2016/09/27/mrt-lrt-common-station.html|access-date=April 10, 2018|archive-date=April 10, 2018|archive-url=https://web.archive.org/web/20180410202101/http://cnnphilippines.com/metro/2016/09/27/mrt-lrt-common-station.html|url-status=dead}}</ref> Secretary Abaya said that SM would be able to keep the naming rights for the station, even if it is transferred near rival Ayala's TriNoma mall.<ref>{{cite news |title=MRT-LRT common station to be located at Trinoma |url=https://www.abs-cbnnews.com/business/04/22/14/mrt-lrt-common-station-be-located-trinoma |work=ABS-CBN News |date=April 22, 2014}}</ref> This led to the change of the station's location, which was initially set to be near SM City North EDSA, earning the ire of the group of the country's largest mall operator SM Prime Holdings Inc., which paid an initial {{Philippine peso|200 million}} for the naming rights of the station.
On November 21, 2013, the NEDA board, chaired by President [[Benigno Aquino III]], approved the construction of a common station within North Avenue between [[SM North EDSA]] and [[TriNoma]], estimated to cost {{Philippine peso|1.4 billion}}. The station was set to feature head-to-head platforms for LRT 1 and MRT 3 trains with a {{convert|147.4|m|ftin|adj=on|abbr=on}} elevated walkalator to MRT 7,<ref name="commonterminal">{{cite news|author=Tan, Kimberly Jane|date=November 21, 2013|title=NEDA approves MRT 7, LRT-1 extension projects|publisher=[[GMA News and Public Affairs]]|url=https://www.gmanetwork.com/news/story/336540/economy/business/neda-approves-mrt-7-lrt-extension-projects|access-date=January 1, 2014}}</ref> inconsistent with the original plan of having seamless connectivity to Monumento and is also an unusual arrangement of having two train stations beside each other.<ref>{{cite news|last1=Marasigan|first1=Gelo|last2=Remitio|first2=Rex|date=September 28, 2016|title=Finally: A common station for LRT, MRT lines|work=CNN Philippines|url=https://cnnphilippines.com/metro/2016/09/27/mrt-lrt-common-station.html|access-date=April 10, 2018|archive-date=April 10, 2018|archive-url=https://web.archive.org/web/20180410202101/http://cnnphilippines.com/metro/2016/09/27/mrt-lrt-common-station.html|url-status=dead}}</ref> Secretary Abaya said that SM would be able to keep the naming rights for the station, even if it is transferred near rival Ayala's TriNoma mall.<ref>{{cite news |title=MRT-LRT common station to be located at Trinoma |url=https://www.abs-cbnnews.com/business/04/22/14/mrt-lrt-common-station-be-located-trinoma |work=ABS-CBN News |date=April 22, 2014}}</ref> This led to the change of the station's location, which was initially set to be near SM City North EDSA, earning the ire of the group of the country's largest mall operator SM Prime Holdings Inc., which paid an initial {{Philippine peso|200 million}} for the naming rights of the station.


Transportation officials have repeatedly said building the station near TriNoma is both economically and environmentally viable, as this would result in a lower cost and less urban blight.
Transportation officials have repeatedly said building the station near TriNoma is both economically and environmentally viable, as this would result in a lower cost and less urban blight.
Line 80: Line 90:


===Agreement===
===Agreement===
At a business forum held on August 12, 2016, Department of Transportation (now abbreviated as DOTr) Secretary [[Arthur Tugade]] said that all stakeholders namely [[Metro Pacific Investments|Metro Pacific Corporation]], SMC-Mass Rail Transit 7 Inc. of San Miguel Corporation, SM Prime Holdings, and Ayala Corporation had agreed in principle that the common station will be built in North Avenue between the Southeast end of SM North EDSA and North side of the TriNoma Mall.<ref>{{cite news |author=Camus, Miguel R. |title=Common railway station row resolved |url=https://business.inquirer.net/213450/common-railway-station-row-resolved |work=Inquirer.net |date=August 13, 2016}}</ref> Negotiations took about 8 years for the station to be built near SM North EDSA and TriNoma.<ref name="ibt">{{cite news |last=Ong |first=Jennifer |title=MRT, LRT Common Station Construction To Start In 2017 |url=https://www.ibtimes.ph/mrt-lrt-common-station-construction-start-2017-philippines-5871 |access-date=January 19, 2017 |work=International Business Times |publisher=IBT Media Inc. |date=January 19, 2017 |url-status=dead |archive-url=https://web.archive.org/web/20170131200327/https://www.ibtimes.ph/mrt-lrt-common-station-construction-start-2017-philippines-5871 |archive-date=January 31, 2017}}</ref>
At a business forum held on August 12, 2016, Department of Transportation (now abbreviated as DOTr) Secretary [[Arthur Tugade]] said that all stakeholders namely [[Metro Pacific Investments]], SMC-Mass Rail Transit 7 Inc. of San Miguel Corporation, SM Prime Holdings, and Ayala Corporation had agreed in principle that the common station will be built in North Avenue between the Southeast end of SM North EDSA and North side of the TriNoma Mall.<ref>{{cite news |author=Camus, Miguel R. |title=Common railway station row resolved |url=https://business.inquirer.net/213450/common-railway-station-row-resolved |work=Inquirer.net |date=August 13, 2016}}</ref> Negotiations took about 8 years for the station to be built near SM North EDSA and TriNoma.<ref name="ibt">{{cite news |last=Ong |first=Jennifer |title=MRT, LRT Common Station Construction To Start In 2017 |url=https://www.ibtimes.ph/mrt-lrt-common-station-construction-start-2017-philippines-5871 |access-date=January 19, 2017 |work=International Business Times |publisher=IBT Media Inc. |date=January 19, 2017 |url-status=usurped |archive-url=https://web.archive.org/web/20170131200327/https://www.ibtimes.ph/mrt-lrt-common-station-construction-start-2017-philippines-5871 |archive-date=January 31, 2017}}</ref>


A memorandum of agreement was signed by the station's stakeholders on January 18, 2017.<ref name="called"/>
A memorandum of agreement was signed by the station's stakeholders on January 18, 2017.<ref name="called"/>
Line 97: Line 107:
| alt1 =
| alt1 =
}}
}}
The groundbreaking ceremony of the station was held on September 29, 2017, marking the start of construction.<ref name="constructionstart" /> It is planned to be completed in 2023. Three areas were designated for the project with each area with its own developers. Area A which will host a platform and concourse for Lines 1 and 3 will be developed by the [[Department of Transportation (Philippines)|Department of Transportation]]. Area B, which covers two concourses that will connect Areas A and C will be developed by North Triangle Depot Commercial Corporation, an affiliate of [[Ayala Land]]. [[San Miguel Corporation]] will develop and finance Area C which will host the Line 7 platform. By January 2017, the projected cost for the station is {{Philippine peso|2.8 billion}}.<ref name="ibt"/><ref>{{Cite AV media|title=Common station na magkokonekta sa LRT1, MRT3 at MRT7, sisimulan sa Disyembre|url=https://www.youtube.com/watch?v=Y7sjt9PN0A0 |archive-url=https://ghostarchive.org/varchive/youtube/20211215/Y7sjt9PN0A0 |archive-date=2021-12-15 |url-status=live|website=YouTube|author=GMA News|date=January 18, 2017|access-date=May 19, 2021}}{{cbignore}}</ref>
The groundbreaking ceremony of the station was held on September 29, 2017, marking the start of construction.<ref name="constructionstart" /> Three areas were designated for the project with each area with its own developers. Area A which will host a platform and concourse for Lines 1 and 3 will be developed by the [[Department of Transportation (Philippines)|Department of Transportation]]. Area B, which covers two concourses that will connect Areas A and C will be developed by North Triangle Depot Commercial Corporation, an affiliate of [[Ayala Land]]. [[San Miguel Corporation]] will develop and finance Area C which will host the Line 7 platform. By January 2017, the projected cost for the station was {{Philippine peso|2.8 billion}}.<ref name="ibt"/><ref>{{Cite AV media|title=Common station na magkokonekta sa LRT1, MRT3 at MRT7, sisimulan sa Disyembre|url=https://www.youtube.com/watch?v=Y7sjt9PN0A0 |archive-url=https://ghostarchive.org/varchive/youtube/20211215/Y7sjt9PN0A0 |archive-date=2021-12-15 |url-status=live|website=YouTube|author=GMA News|date=January 18, 2017|access-date=May 19, 2021}}{{cbignore}}</ref>


The construction of Area A is carried out by BF Corporation and Foresight Development and Surveying Company. The contract for the construction of Area A was signed on February 13, 2019.<ref>{{Cite news|first=Denise A.|last=Valdez|title=Contracting arrangements finalized for common station|url=https://www.bworldonline.com/contracting-arrangements-finalized-for-common-station/|work=BusinessWorld|date=February 13, 2019|access-date=August 15, 2021}}</ref> The Area A involves a spur line branching from Line 1's portion, reusing the previously dug foundations originally intended for the station in front of SM North EDSA for its pier beams. All-steel girders will be used.
The construction of Area A is carried out by BF Corporation and Foresight Development and Surveying Company. The contract for the construction of Area A was signed on February 13, 2019.<ref>{{Cite news|first=Denise A.|last=Valdez|title=Contracting arrangements finalized for common station|url=https://www.bworldonline.com/contracting-arrangements-finalized-for-common-station/|work=BusinessWorld|date=February 13, 2019|access-date=August 15, 2021}}</ref> The Area A involves a spur line branching from Line 1's portion, reusing the previously dug foundations originally intended for the station in front of SM North EDSA for its pier beams. All-steel girders will be used.


{{as of|2023|01|31|df=US}}, the station is 79.72% complete.<ref>{{cite web|url=https://www.congress.gov.ph/photojournal/zoom.php?photoid=4499|title=HOUSE TACKLES DOTR'S RAILWAY PROJECTS STATUS, URGES AGENCY TO FIX PROJECT DELAYS|author=<!--Not stated-->|date=16 February 2023|publisher=Press and Public Affairs Bureau|website=[[House of Representatives of the Philippines]]|access-date=21 February 2023}}</ref> The station was originally supposed to open in January 2021,<ref name="untv" /> but mainly due to the [[COVID-19 pandemic in the Philippines|COVID-19 pandemic]], which affected manpower as well as construction logistics delays, the station opening was postponed to June 2023,<ref name="untv" /> with full operations expected to begin by 2025.<ref name="untv" /> Issues such as utilities relocation, the aforementioned pandemic-related issues, and systems upgrades (such as signalling & automated fare collection)<ref name="untv" /> contributed to repeated completion delays. In April, additional delays have pushed back the opening of the common station to the end of 2023.<ref name=":0">{{Cite web |last=Manabat |first=Jacque |date=April 12, 2023 |title=Opening of common station for train lines postponed anew |url=https://news.abs-cbn.com/business/04/12/23/opening-of-common-station-for-train-lines-postponed-anew |website=ABS-CBN News}}</ref>
{{as of|2023|01|31|df=US}}, the station is 79.72% complete.<ref>{{cite web|url=https://www.congress.gov.ph/photojournal/zoom.php?photoid=4499|title=HOUSE TACKLES DOTR'S RAILWAY PROJECTS STATUS, URGES AGENCY TO FIX PROJECT DELAYS|author=<!--Not stated-->|date=16 February 2023|publisher=Press and Public Affairs Bureau|website=[[House of Representatives of the Philippines]]|access-date=21 February 2023}}</ref> The station was originally supposed to open in January 2021,<ref name="untv">{{cite interview|last=Chavez|first=Cesar|interviewer=JP Nuñez|title=Common Station na magdurugtong sa MRT-3 at LRT-1, planong buksan sa Hunyo – DOTr|trans-title=Common Station that will connect MRT Line 3 and LRT Line 1, planned to open in June – DOTr|language=Filipino|work=[[Ito Ang Balita]]|date=20 February 2023|publisher=[[UNTV (Philippines)|UNTV News and Rescue]]|location=Philippines|url=https://www.youtube.com/watch?v=Ip6DpFpD9lA|access-date=21 February 2023}}{{unreliable source?|date=October 2023|reason=User-generated sources are unreliable sources.}}</ref> but mainly due to the [[COVID-19 pandemic in the Philippines|COVID-19 pandemic]], which affected manpower as well as construction logistics delays, the station opening was postponed to June 2023,<ref name="untv" /> with full operations expected to begin by 2025.<ref name="untv" /> Issues such as utilities relocation, the aforementioned pandemic-related issues, and systems upgrades (such as signaling & automated fare collection)<ref name="untv" /> contributed to repeated completion delays. In April, additional delays have pushed back the opening of the common station to the end of 2023.<ref name=":0">{{Cite web |last=Manabat |first=Jacque |date=April 12, 2023 |title=Opening of common station for train lines postponed anew |url=https://news.abs-cbn.com/business/04/12/23/opening-of-common-station-for-train-lines-postponed-anew |website=ABS-CBN News}}</ref> A delay in payments to the contractor also impacted construction progress, which delayed the opening to January 2024.<ref name=":2">{{Cite web |title=Department of Transportation Consolidated Annual Audit Report 2023 Part 2 |url=https://www.coa.gov.ph/reports/annual-audit-reports/aar-ngs/#49-7223-department-of-transportation-2023-1710308658 |access-date=2025-01-04 |website=[[Commission on Audit]]}}</ref> According to a documentary by [[Reporter's Notebook]], as of July 2024, the station is 81.49% complete and is expected to open in January 2025.<ref name=":1" />


==Naming==
==Naming==
Line 107: Line 117:


==Station layout==
==Station layout==
The station is divided into three primary areas: areas A, B, and C.<ref name=":2" /> Area A, also called the EDSA wing, will be developed by the DOTr and is located on top of [[EDSA]]. The area will have platforms and a concourse for LRT Line 1 and MRT Line 3. Area B, to be constructed by Ayala Land, consists of two connections, linking Area A to Area C, Trinoma, and SM North EDSA: the "Atrium" or the north common concourse as well as a secondary connection, the south common concourse.<ref>{{Cite web |title=Edsa Common Station construction done by March this year |url=https://www.pna.gov.ph/articles/1169111 |access-date=2024-11-17 |website=www.pna.gov.ph |language=en}}</ref> Area C, or the North Avenue wing, hosts a platform and concourse for MRT Line 7 and will be developed by San Miguel Corporation on top of [[North Avenue (Quezon City)|North Avenue]], beside SM North EDSA.<ref name="ibt" /> The station for the Metro Manila Subway is a stand-alone structure located on the corner of [[Mindanao Avenue]] and North Avenue near the [[Veterans Memorial Medical Center]].<ref>{{Cite web |last=Yu |first=Lance Spencer |date=2024-03-08 |title=MAP: Metro Manila Subway stations |url=https://www.rappler.com/business/map-metro-manila-subway-stations/ |url-access=registration |access-date=2024-11-17 |website=RAPPLER |language=en-US}}</ref> This will be accessible via a short walk from Area C.<!--
The station is divided into three primary areas: A, B, and C. Area A hosts a platform and concourse for Lines 1 and 3. Area B will connect Areas A and C. Area C hosts a platform and concourse for Line 7.<ref name="ibt" />
<!--
<div style="overflow: auto">
<div style="overflow: auto">
=== Area A ===
=== Area A ===
Line 141: Line 150:
==See also==
==See also==
*[[List of rail transit stations in Metro Manila]]
*[[List of rail transit stations in Metro Manila]]
*[[Rail transportation in the Greater Manila Area]]
*[[Manila Light Rail Transit System]]


==External links==
==External links==
Line 157: Line 166:
[[Category:Buildings and structures in Quezon City]]
[[Category:Buildings and structures in Quezon City]]
[[Category:Railway stations under construction in the Philippines]]
[[Category:Railway stations under construction in the Philippines]]
[[Category:Railway stations scheduled to open in 2024]]
[[Category:Railway stations scheduled to open in 2025]]

Revision as of 13:13, 4 January 2025

North Triangle Common Station
North EDSA
The construction progress of Area A in October 2023
General information
Other names
  • North Avenue
  • North EDSA (MRT-7)[1]
  • North Triangle
  • Unified Grand Central Station
Location Quezon City, Metro Manila
Philippines
Owned by
Operated by
Line(s)
PlatformsSide and island platforms
Tracks7
ConnectionsFuture:  MMS  North Avenue
Construction
Structure typeElevated
ParkingYes (Trinoma, SM North EDSA)
Other information
StatusUnder construction
Station codeS01 (MRT-7)
History
OpeningJanuary 2025 (partial)[2]
Passengers
478,000 (projected)[3]
Services
Preceding station LRTA_Logo
Manila LRT
Following station
Terminus LRT Line 1 Fernando Poe Jr.
towards Dr. Santos
Preceding station Manila MRT Following station
Terminus MRT Line 3 Quezon Avenue
towards Taft Avenue
MRT Line 7 Quezon Memorial Circle

The North Triangle Common Station[4][5], officially designated as the Unified Grand Central Station[6] and North EDSA for the MRT Line 7[1], commonly known as the Common Station or North Triangle station, is an under-construction[7] rapid transit terminal and transport hub that will connect LRT Line 1, MRT Line 3, and MRT Line 7,[8] and the nearby Metro Manila Subway.[9][10] It is located in Bagong Pag-asa, Quezon City, Philippines, and is named after its location, which is at the corner of EDSA and North Avenue.[11]

The common alignment had been in limbo for years since the Department of Transportation and Communications (DOTC), now Department of Transportation (DOTr), reviewed the project's technical and financial components.[12] It was in January 2017 that an agreement was reached to build the station. The groundbreaking of the station was held at the North Triangle Transport Terminal in September 2017. The station was initially expected to fully open in January 2021, but repeated delays have set back its opening to January 2025.[13][2]

History

Negotiations

On June 2, 2011, the Department of Transportation and Communications (DOTC) called for bidders for the contract to build the station, which was estimated to cost 1.5 billion.[8] But on July 13 of that year, then-Secretary of Transportation and Communications Mar Roxas announced a review of the project and considering adding store space for lease. The government, by that time, had allotted ₱2 billion for its construction.[11]

On July 22, 2012, the government shelved the project indefinitely due to the Philippine financial crisis in favor of demolition of the tracks and pillars.[14] Secretary Roxas said that the station was being studied by engineers because the MRT-3's original plans did not include the station, and that problems with the line's timing system may arise. He included that in the event that the station does not go through, the ₱200 million paid by SM Prime Holdings, Inc., the operator of SM City North EDSA and other SM Malls, to the Light Rail Transit Authority for naming rights may have to be returned.

However, at the start of 2013, Roxas' successor, Joseph Emilio Abaya announced that the government has cancelled and abandoned the project indefinitely because the construction of the common station was supposed to be completed back in May 2010 during the presidency of Gloria Macapagal Arroyo but disputes over cost, engineering issues and naming rights caused due to the halting of the project by Arroyo's successor President Benigno Aquino III on January 2, 2013.

On January 9, 2013, Abaya announced that the government has filed for the candidacies for three sites of the common station linking three rapid transit systems for Metro Manila, DOTC is not keen on build the common station in front of the Annex Building of the SM North EDSA shopping mall, adding that other potential locations are the TriNoma mall and the Malvar LRT station in Caloocan. Abaya said the agency is awaiting the results of a study that would determine the final location of the common station. He had said the original design near SM City North EDSA Annex was "ineffective and costly" because the rails of Line 3 would have to be extended and trains would have to be added.[15]

On November 21, 2013, the NEDA board, chaired by President Benigno Aquino III, approved the construction of a common station within North Avenue between SM North EDSA and TriNoma, estimated to cost ₱1.4 billion. The station was set to feature head-to-head platforms for LRT 1 and MRT 3 trains with a 147.4 m (483 ft 7 in) elevated walkalator to MRT 7,[16] inconsistent with the original plan of having seamless connectivity to Monumento and is also an unusual arrangement of having two train stations beside each other.[17] Secretary Abaya said that SM would be able to keep the naming rights for the station, even if it is transferred near rival Ayala's TriNoma mall.[18] This led to the change of the station's location, which was initially set to be near SM City North EDSA, earning the ire of the group of the country's largest mall operator SM Prime Holdings Inc., which paid an initial ₱200 million for the naming rights of the station.

Transportation officials have repeatedly said building the station near TriNoma is both economically and environmentally viable, as this would result in a lower cost and less urban blight.

SM Prime then brought its battle to the Supreme Court, which issued a stay order against the DOTC and the Light Rail Transit Authority (LRTA) in June 2014, enjoining them to stop the transfer of the common alignment's location.[12][19][20]

Agreement

At a business forum held on August 12, 2016, Department of Transportation (now abbreviated as DOTr) Secretary Arthur Tugade said that all stakeholders namely Metro Pacific Investments, SMC-Mass Rail Transit 7 Inc. of San Miguel Corporation, SM Prime Holdings, and Ayala Corporation had agreed in principle that the common station will be built in North Avenue between the Southeast end of SM North EDSA and North side of the TriNoma Mall.[21] Negotiations took about 8 years for the station to be built near SM North EDSA and TriNoma.[22]

A memorandum of agreement was signed by the station's stakeholders on January 18, 2017.[6]

Construction

Area B construction progress in January 2020
Area C construction progress in August 2022

The groundbreaking ceremony of the station was held on September 29, 2017, marking the start of construction.[20] Three areas were designated for the project with each area with its own developers. Area A which will host a platform and concourse for Lines 1 and 3 will be developed by the Department of Transportation. Area B, which covers two concourses that will connect Areas A and C will be developed by North Triangle Depot Commercial Corporation, an affiliate of Ayala Land. San Miguel Corporation will develop and finance Area C which will host the Line 7 platform. By January 2017, the projected cost for the station was ₱2.8 billion.[22][23]

The construction of Area A is carried out by BF Corporation and Foresight Development and Surveying Company. The contract for the construction of Area A was signed on February 13, 2019.[24] The Area A involves a spur line branching from Line 1's portion, reusing the previously dug foundations originally intended for the station in front of SM North EDSA for its pier beams. All-steel girders will be used.

As of January 31, 2023, the station is 79.72% complete.[25] The station was originally supposed to open in January 2021,[26] but mainly due to the COVID-19 pandemic, which affected manpower as well as construction logistics delays, the station opening was postponed to June 2023,[26] with full operations expected to begin by 2025.[26] Issues such as utilities relocation, the aforementioned pandemic-related issues, and systems upgrades (such as signaling & automated fare collection)[26] contributed to repeated completion delays. In April, additional delays have pushed back the opening of the common station to the end of 2023.[13] A delay in payments to the contractor also impacted construction progress, which delayed the opening to January 2024.[27] According to a documentary by Reporter's Notebook, as of July 2024, the station is 81.49% complete and is expected to open in January 2025.[2]

Naming

In 2009, SM Prime Holdings which owns SM North EDSA secured naming rights for the station by paying ₱200 million while Ayala which owns TriNoma contributed ₱150 million which also made it eligible for naming rights.[6] In January 2017, it was agreed that naming rights of both SM Prime Holdings and Ayala will be honored and until the two companies agreed upon a name, the station shall be temporarily called as the Unified Grand Central Station.[6]

Station layout

The station is divided into three primary areas: areas A, B, and C.[27] Area A, also called the EDSA wing, will be developed by the DOTr and is located on top of EDSA. The area will have platforms and a concourse for LRT Line 1 and MRT Line 3. Area B, to be constructed by Ayala Land, consists of two connections, linking Area A to Area C, Trinoma, and SM North EDSA: the "Atrium" or the north common concourse as well as a secondary connection, the south common concourse.[28] Area C, or the North Avenue wing, hosts a platform and concourse for MRT Line 7 and will be developed by San Miguel Corporation on top of North Avenue, beside SM North EDSA.[22] The station for the Metro Manila Subway is a stand-alone structure located on the corner of Mindanao Avenue and North Avenue near the Veterans Memorial Medical Center.[29] This will be accessible via a short walk from Area C.

See also

References

  1. ^ a b 한국철도TV (November 18, 2022). "필리핀 기차, 한국철도 기술을 담다 🚄 | KORAIL PHILIPPINE BRANCH". YouTube. Archived from the original on December 21, 2022. Retrieved December 21, 2022.
  2. ^ a b c GMA Public Affairs (October 7, 2024). Mga railway project ng gobyerno, kumusta na ngayon? (Full Episode) | Reporter’s Notebook. Retrieved October 8, 2024 – via YouTube.
  3. ^ Rosales, Clara (June 9, 2022). "LOOK: The Common Station Connecting Metro Trains is Almost Complete". reportr.world. Retrieved June 9, 2022.
  4. ^ "Take a look at the North Avenue Common Station project". philkotse.com. Retrieved April 26, 2021.
  5. ^ "North Triangle Common Station". Visionarch. Retrieved April 26, 2021.
  6. ^ a b c d Gonzales, Yuji Vincent (January 19, 2017). "What will the MRT-LRT common station be called?". Inquirer.net. Retrieved January 19, 2017.
  7. ^ Jiao, Claire (September 29, 2017). "LRT-MRT common station breaks ground". CNN Philippines. Archived from the original on April 11, 2018. Retrieved April 10, 2018.
  8. ^ a b Montecillo, Paolo G. (June 5, 2011). "Bidders for LRT-MRT central station sought". Inquirer.net. Retrieved October 23, 2012.
  9. ^ Pateña, Aerol John (February 13, 2019). "DOTr inks deal on common station construction". Philippine News Agency. Retrieved February 22, 2022.
  10. ^ Department of Transportation (March 7, 2022). "DOTr - CONSTRUCTION OF COMMON STATION STRUCTURE TO BE COMPLETED BY END OF MARCH 2022 – TUGADE". dotr.gov.ph. Archived from the original on March 8, 2022. Retrieved March 31, 2022.
  11. ^ a b Montecillo, Paolo G. (July 13, 2011). "DOTC reviews MRT-LRT central station project". Inquirer.net. Retrieved October 24, 2012.
  12. ^ a b Marasigan, Lorenz S. (February 25, 2015). "SM ready to end feud with Ayala". BusinessMirror.
  13. ^ a b Manabat, Jacque (April 12, 2023). "Opening of common station for train lines postponed anew". ABS-CBN News.
  14. ^ Venzon, Cliff Harvey (July 23, 2012). "Central station near SM North shelved". BusinessWorld. Archived from the original on April 26, 2021. Retrieved April 26, 2021.
  15. ^ Amojelar, Darwin G. (January 9, 2013). "DOTC to choose among 3 possible sites for common train station". Archived from the original on February 2, 2017.
  16. ^ Tan, Kimberly Jane (November 21, 2013). "NEDA approves MRT 7, LRT-1 extension projects". GMA News and Public Affairs. Retrieved January 1, 2014.
  17. ^ Marasigan, Gelo; Remitio, Rex (September 28, 2016). "Finally: A common station for LRT, MRT lines". CNN Philippines. Archived from the original on April 10, 2018. Retrieved April 10, 2018.
  18. ^ "MRT-LRT common station to be located at Trinoma". ABS-CBN News. April 22, 2014.
  19. ^ Flores, Mikhail Franz; dela Paz, Chrisee Jalyssa (August 2, 2014). "High court stops transfer of common train station site". BW. Archived from the original on June 16, 2018. Retrieved August 2, 2014.
  20. ^ a b Fe, Kaye (September 29, 2017). "Construction of P2.8-B Grand Unified Central Station to begin after almost a decade of delay". Eagle News. Eagle Broadcasting Corporation. Retrieved September 29, 2017.
  21. ^ Camus, Miguel R. (August 13, 2016). "Common railway station row resolved". Inquirer.net.
  22. ^ a b c Ong, Jennifer (January 19, 2017). "MRT, LRT Common Station Construction To Start In 2017". International Business Times. IBT Media Inc. Archived from the original on January 31, 2017. Retrieved January 19, 2017.
  23. ^ GMA News (January 18, 2017). Common station na magkokonekta sa LRT1, MRT3 at MRT7, sisimulan sa Disyembre. YouTube. Archived from the original on December 15, 2021. Retrieved May 19, 2021.
  24. ^ Valdez, Denise A. (February 13, 2019). "Contracting arrangements finalized for common station". BusinessWorld. Retrieved August 15, 2021.
  25. ^ "HOUSE TACKLES DOTR'S RAILWAY PROJECTS STATUS, URGES AGENCY TO FIX PROJECT DELAYS". House of Representatives of the Philippines. Press and Public Affairs Bureau. February 16, 2023. Retrieved February 21, 2023.
  26. ^ a b c d Chavez, Cesar (February 20, 2023). "Common Station na magdurugtong sa MRT-3 at LRT-1, planong buksan sa Hunyo – DOTr" [Common Station that will connect MRT Line 3 and LRT Line 1, planned to open in June – DOTr]. Ito Ang Balita (Interview) (in Filipino). Interviewed by JP Nuñez. Philippines: UNTV News and Rescue. Retrieved February 21, 2023.[unreliable source?]
  27. ^ a b "Department of Transportation Consolidated Annual Audit Report 2023 Part 2". Commission on Audit. Retrieved January 4, 2025.
  28. ^ "Edsa Common Station construction done by March this year". www.pna.gov.ph. Retrieved November 17, 2024.
  29. ^ Yu, Lance Spencer (March 8, 2024). "MAP: Metro Manila Subway stations". RAPPLER. Retrieved November 17, 2024.

14°39′21″N 121°1′41″E / 14.65583°N 121.02806°E / 14.65583; 121.02806