Bedok South MRT station: Difference between revisions
No edit summary |
No edit summary |
||
(46 intermediate revisions by 26 users not shown) | |||
Line 1: | Line 1: | ||
{{Use dmy dates|date=January 2023}} |
|||
{{Distinguish|Bedok MRT station|Bedok North MRT station|Bedok Reservoir MRT station|Sungei Bedok MRT station}} |
|||
{{short description|Future Mass Rapid Transit station in Singapore}} |
|||
{{about|the future MRT station on the Thomson–East Coast line|other stations with the name Bedok|Bedok station (disambiguation)}} |
|||
{{Infobox station |
{{Infobox station |
||
| background = |
| background = |
||
| name = {{SMRT Infobox Colour |
| name = {{SMRT Infobox Colour |
||
| enname = Bedok South |
|||
| zhname = 勿洛南 |
|||
| taname = பிடோக் சவுத் |
|||
| msname = Bedok South |
|||
| line = thomson-east coast |
|||
| line2 = |
|||
| line3 = |
|||
| code = {{SMRT code|TE|30}} |
|||
| terminicode = |
|||
}} |
}} |
||
| type = [[Mass Rapid Transit (Singapore)|Mass Rapid Transit]] (MRT) station |
| type = Future [[Mass Rapid Transit (Singapore)|Mass Rapid Transit]] (MRT) station |
||
| image= |
| image=TE30 Bedok South MRT construction 20240708 104811.jpg |
||
| image_caption= |
| image_caption=An entrance of Bedok South station nearing completion |
||
| address=620 Upper East Coast Road <br> Singapore 468324 |
|||
| address= |
|||
| coordinates={{coord|1.316613|103.948276|display=inline,title}} |
| coordinates={{coord|1.316613|103.948276|type:railwaystation_region:SG|format=dms|display=inline,title}} |
||
| line={{rail color box|system=SMRT|line=Thomson-East Coast}} |
| line={{rail color box|system=SMRT|line=Thomson-East Coast}} |
||
| other= |
| other= |
||
| structure=Underground |
| structure=Underground |
||
| platform= |
| platform=2 ([[1 island platform]]) |
||
| depth=22m |
| depth=22m |
||
| levels= |
| levels=1 |
||
| tracks=2 |
| tracks=2 |
||
| parking= |
| parking= |
||
Line 32: | Line 34: | ||
| pass_percent= |
| pass_percent= |
||
| pass_system= |
| pass_system= |
||
| opening= {{start date and age|df=yes| |
| opening= {{start date and age|df=yes|2026}} |
||
| closed= |
| closed= |
||
| rebuilt= |
| rebuilt= |
||
| electrified= |
| electrified= |
||
| |
| accessible= Yes |
||
| operator=[[SMRT Trains|SMRT Trains Ltd]] ([[SMRT Corporation]]) |
|||
| owned=[[Land Transport Authority]] |
| owned=[[Land Transport Authority]] |
||
| zone= |
| zone= |
||
| former= |
| former= |
||
| services={{ |
| services={{Adjacent stations |system=SMRT |line=Thomson-East Coast |left=Bayshore |right=Sungei Bedok |type=TEL5}} |
||
| mpassengers= |
| mpassengers= |
||
| map_type = Singapore Rail |
| map_type = Singapore Rail |
||
Line 50: | Line 52: | ||
}} |
}} |
||
'''Bedok South MRT station''' is a future underground [[Mass Rapid Transit (Singapore)|Mass Rapid Transit]] station on the [[Thomson–East Coast MRT |
'''Bedok South MRT station''' is a future underground [[Mass Rapid Transit (Singapore)|Mass Rapid Transit]] (MRT) station on the [[Thomson–East Coast MRT line|Thomson–East Coast line]] in [[Bedok]] planning area, Singapore.<ref>{{cite web | url=http://www.lta.gov.sg/content/ltaweb/en/public-transport/projects/tel/stages.html | title=Stages of Thomson–East Coast Line | publisher=Land Transport Authority | date=15 August 2014 | access-date=15 August 2014 | archive-date=17 August 2014 | archive-url=https://web.archive.org/web/20140817201701/http://www.lta.gov.sg/content/ltaweb/en/public-transport/projects/tel/stages.html | url-status=live }}</ref> |
||
The station will be located next to [[Temasek Secondary School]], at the intersection of Upper East Coast Road and Bedok South Road. |
The station will be located next to [[Temasek Secondary School]], at the intersection of Upper East Coast Road and Bedok South Road. |
||
==History== |
==History== |
||
On 15 August 2014, LTA announced that Bedok South station would be part of the proposed [[ |
On 15 August 2014, LTA announced that Bedok South station would be part of the proposed [[Thomson–East Coast MRT line|Thomson–East Coast line]] (TEL). The station will be constructed as part of Stage 5, consisting of 2 stations between Bedok South and [[Sungei Bedok MRT station|Sungei Bedok]], and was expected to be completed in 2024.<ref>{{Cite web|url=http://app.lta.gov.sg/apps/news/page.aspx?c=2&id=3cc2e460-06ea-4245-a37f-df11b602ec7d|archive-url=https://web.archive.org/web/20140819084445/http://app.lta.gov.sg/apps/news/page.aspx?c=2&id=3cc2e460-06ea-4245-a37f-df11b602ec7d|url-status=dead|archive-date=19 August 2014|title=Joint News Release by the Land Transport Authority & Singapore Land Authority - Thomson-East Coast Line: New MRT Links in the East {{!}} Press Room {{!}} Land Transport Authority|date=19 August 2014|access-date=13 February 2020}}</ref><ref>{{Cite web|url=https://www.lta.gov.sg/content/ltagov/en/upcoming_projects/rail_expansion/thomson_east_coast_line.html|archive-url=https://web.archive.org/web/20200213075700/https://www.lta.gov.sg/content/ltagov/en/upcoming_projects/rail_expansion/thomson_east_coast_line.html|url-status=dead|archive-date=13 February 2020|title=LTA {{!}} Upcoming Projects {{!}} Rail Expansion {{!}} Thomson-East Coast Line|date=13 February 2020|access-date=13 February 2020}}</ref> |
||
Contract T311 for the design and construction of Bedok South Station and associated tunnels was awarded to China Jingye Engineering Corporation Limited (Singapore Branch) |
Contract T311 for the design and construction of Bedok South Station and associated tunnels was awarded to China Jingye Engineering Corporation Limited (Singapore Branch) for S$188 million in April 2016. Construction started in 2016.<ref>{{Cite web|url=https://www.lta.gov.sg/content/ltagov/en/newsroom/2016/4/2/lta-awards-two-contracts-for-thomson-east-coast-lines-amber-and-bedok-south-stations.html|title=LTA {{!}} News Room {{!}} News Releases {{!}} LTA Awards Two Contracts for Thomson-East Coast Line's Amber and Bedok South Stations|website=www.lta.gov.sg|access-date=13 February 2020|archive-date=13 February 2020|archive-url=https://web.archive.org/web/20200213065615/https://www.lta.gov.sg/content/ltagov/en/newsroom/2016/4/2/lta-awards-two-contracts-for-thomson-east-coast-lines-amber-and-bedok-south-stations.html|url-status=live}}</ref> |
||
Stage 5 of the TEL was slated to commence passenger service in 2025 instead of 2024 due to the [[COVID-19 pandemic in Singapore|COVID-19 pandemic]].<ref>{{cite web |title=Written Reply by Minister for Transport Ong Ye Kung to Parliamentary Question on Updates on Thomson East Coast Line, Jurong Region Line and Cross Island Line |url=https://www.mot.gov.sg/news-centre/news/Detail/written-reply-by-minister-for-transport-ong-ye-kung-to-parliamentary-question-on-updates-on-thomson-east-coast-line-jurong-region-line-and-cross-island-line |website=Land Transport Authority |access-date=17 May 2021 |archive-date=17 May 2021 |archive-url=https://web.archive.org/web/20210517000023/https://www.mot.gov.sg/news-centre/news/Detail/written-reply-by-minister-for-transport-ong-ye-kung-to-parliamentary-question-on-updates-on-thomson-east-coast-line-jurong-region-line-and-cross-island-line |url-status=dead }}</ref> Due to challenges of tunnelling near existing critical infrastructure, the station's construction was further delayed to 2026.<ref name="y529">{{cite web | last=Loi | first=Esther | last2=William | first2=Whitney | title=Delayed opening of TEL Stage 5 irks some residents; others resigned to the longer wait | website=The Straits Times | date=10 March 2024 | url=https://www.straitstimes.com/singapore/transport/delayed-opening-of-tel-stage-5-irks-some-residents-others-resigned-to-the-longer-wait | access-date=8 May 2024}}</ref> |
|||
==References== |
==References== |
||
Line 66: | Line 70: | ||
[[Category:Proposed railway stations in Singapore]] |
[[Category:Proposed railway stations in Singapore]] |
||
[[Category:Mass Rapid Transit (Singapore) stations]] |
[[Category:Mass Rapid Transit (Singapore) stations]] |
||
[[Category:Railway stations scheduled to open in |
[[Category:Railway stations scheduled to open in 2026]] |
||
{{Singapore-MRT-stub}} |
{{Singapore-MRT-stub}} |
Latest revision as of 07:27, 14 October 2024
TE30
Bedok South 勿洛南 பிடோக் சவுத் | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Future Mass Rapid Transit (MRT) station | |||||||||||
General information | |||||||||||
Location | 620 Upper East Coast Road Singapore 468324 | ||||||||||
Coordinates | 1°19′00″N 103°56′54″E / 1.316613°N 103.948276°E | ||||||||||
Owned by | Land Transport Authority | ||||||||||
Operated by | SMRT Trains Ltd (SMRT Corporation) | ||||||||||
Line(s) | |||||||||||
Platforms | 2 (1 island platform) | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Structure type | Underground | ||||||||||
Depth | 22m | ||||||||||
Platform levels | 1 | ||||||||||
Accessible | Yes | ||||||||||
History | |||||||||||
Opening | 2026 | ||||||||||
Services | |||||||||||
| |||||||||||
|
Bedok South MRT station is a future underground Mass Rapid Transit (MRT) station on the Thomson–East Coast line in Bedok planning area, Singapore.[1]
The station will be located next to Temasek Secondary School, at the intersection of Upper East Coast Road and Bedok South Road.
History
[edit]On 15 August 2014, LTA announced that Bedok South station would be part of the proposed Thomson–East Coast line (TEL). The station will be constructed as part of Stage 5, consisting of 2 stations between Bedok South and Sungei Bedok, and was expected to be completed in 2024.[2][3]
Contract T311 for the design and construction of Bedok South Station and associated tunnels was awarded to China Jingye Engineering Corporation Limited (Singapore Branch) for S$188 million in April 2016. Construction started in 2016.[4]
Stage 5 of the TEL was slated to commence passenger service in 2025 instead of 2024 due to the COVID-19 pandemic.[5] Due to challenges of tunnelling near existing critical infrastructure, the station's construction was further delayed to 2026.[6]
References
[edit]- ^ "Stages of Thomson–East Coast Line". Land Transport Authority. 15 August 2014. Archived from the original on 17 August 2014. Retrieved 15 August 2014.
- ^ "Joint News Release by the Land Transport Authority & Singapore Land Authority - Thomson-East Coast Line: New MRT Links in the East | Press Room | Land Transport Authority". 19 August 2014. Archived from the original on 19 August 2014. Retrieved 13 February 2020.
- ^ "LTA | Upcoming Projects | Rail Expansion | Thomson-East Coast Line". 13 February 2020. Archived from the original on 13 February 2020. Retrieved 13 February 2020.
- ^ "LTA | News Room | News Releases | LTA Awards Two Contracts for Thomson-East Coast Line's Amber and Bedok South Stations". www.lta.gov.sg. Archived from the original on 13 February 2020. Retrieved 13 February 2020.
- ^ "Written Reply by Minister for Transport Ong Ye Kung to Parliamentary Question on Updates on Thomson East Coast Line, Jurong Region Line and Cross Island Line". Land Transport Authority. Archived from the original on 17 May 2021. Retrieved 17 May 2021.
- ^ Loi, Esther; William, Whitney (10 March 2024). "Delayed opening of TEL Stage 5 irks some residents; others resigned to the longer wait". The Straits Times. Retrieved 8 May 2024.